BOKA Powell LLC announced today that a new full-service sustainable apartment development called "RiverView" near downtown Austin is under construction. The complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake views, and is slated to open spring 2013.
BOKA Powell provided the planning, architectural design and interior design services for this 280,000-sf project, which includes 302 apartments, luxury amenities including a fitness center, resort-style pool, resident lounge, demonstration kitchen and business center, as well as access to hiking/biking trails. Four contemporary buildings ranging from five to 11 stories are clustered around a lushly landscaped courtyard and pool deck.
Clad with a mix of local brick, stucco, and metal panels, the exterior design is a juxtaposition of old and new. Soaring roof planes unify the buildings and focus the orientation of the project toward Lady Bird Lake.
The project is designed to be a model for green development and is seeking a LEED Silver rating. Green features include water-saving plumbing fixtures, low-VOC finishes, local and recycled materials, and preferred parking for fuel efficient vehicles.
Storm water entering the site is collected and stored in an underground cistern for irrigation of native plants.
RiverView is the first high-rise residential development south of the Lake in Austin.
The project will provide an improved hike and bike trail along Riverside Drive, and public access to the planned boardwalk along Lady Bird Lake.
Dallas-based CDK Realty Advisors LP provided the equity for this project. Southern Cross Constructions is the construction contractor, and The Whitworth Company is providing project management services. BD+C
Related Stories
| Jun 30, 2014
Zaha Hadid's Iraq Parliament complex design marred with controversy
Zaha Hadid's design for the Iraq Parliament was selected, despite placing third in the original RIBA-organized competition.
Sponsored | | Jun 27, 2014
SAFTI FIRST Now Offers GPX Framing with Sunshade Connectors
For the Doolittle Maintenance Facility, SAFTI FIRST provided 60 minute, fire resistive wall openings in the exterior using SuperLite II-XL 60 insulated with low-e glazing in GPX Framing with a clear anodized finish.
| Jun 26, 2014
Glazing offers peace-of-mind for hurricane season
SPONSORED CONTENT As hurricane season kicks into high gear, it reinforces the importance of balancing the aesthetic and daylight enhancements of glazing with the safety requirements to protect people and structures from hurricane-force winds.
| Jun 26, 2014
Plans for Britain’s newest landmark brings in international cooperation
Designers of the London Eye will team up with companies from France, the Netherlands and the United States to construct i360 Brighton, the U.K.'s newest observation tower.
| Jun 25, 2014
The best tall buildings of 2014
Four high-rise buildings from multiple continents have been selected as the best of their region. The best worldwide tall building will be announced November 6.
| Jun 25, 2014
AIA Foundation launches Regional Resilient Design Studio
The Studio is the first to be launched as part of the AIA Foundation’s National Resilience Program, which plans to open a total of five Regional Resilience Design Studios nationwide in collaboration with Architecture for Humanity, and Public Architecture.
| Jun 25, 2014
Frank Lloyd Wright’s Spring House, Cincinnati’s Union Terminal among 11 Most Endangered Historic Places for 2014
The National Trust for Historic Preservation released its annual list of 11 Most Endangered Historical Sites in the United States for 2014.
| Jun 25, 2014
Best of Britain: 56 buildings make it to the RIBA Stirling Prize's longlist
The longlist for the 2014 prize includes Foster + Partners' Marseille and London's now-famous Shard, designed by Renzo Piano.
| Jun 25, 2014
Green Building Initiative Announces New Appointments to Board
Glumac consulting engineer CEO Steve Straus and Plum Creek director of real estate Doug Cole join GBI's board of directors.
| Jun 25, 2014
Taking a page from Lean manufacturing for improved design review processes
SPONSORED CONTENT As more building project teams look for ways to collaborate better, technology continues to provide solutions. Yet, as I learned from the experience of one of my customers, choosing the wrong technology can have an underwhelming effect, causing a team to simply swap out old challenges for new ones.