flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Austin’s newest entertainment and hospitality complex has been made from repurposed shipping containers

Building Team

Austin’s newest entertainment and hospitality complex has been made from repurposed shipping containers

The Pitch consists of 23 containers that serve as food and beverage outlets, co-working spaces, and viewing areas.


By Novid Parsi, Contributing Editor | July 13, 2022
The Pitch Austin ext 1
Courtesy Casey Dunn.

A new entertainment and hospitality complex in Austin, The Pitch, has been made out of repurposed shipping containers. 

Designed by the Austin-based firm Mark Odom Studio, The Pitch consists of 23 shipping containers that serve as food and beverage outlets, as well as co-working spaces and viewing areas that look onto live entertainment and volleyball and pickleball courts. The Pitch is part of a large sports venue and entertainment complex for Austin FC soccer fans and the community.

“The developer, Karlin Real Estate, was interested in using shipping containers; they had not worked with a container concept before and really wanted to lean into the idea,” Mark Odom, founding principal, Mark Odom Studio, said in a statement. “We have previously studied the use of containers for commercial, retail, and multi-family designs, all of which were un-built. We feel that The Pitch is the first project of its kind in Austin and the region.”

The containers come in two standard modular sizes: 8 by 20 feet and 8 by 40 feet. The containers are stacked to create two stories, then grouped into five separate building pods of varying square footages. The ground-level containers serve as food and beverage outlets for local vendors. The second-level containers serve multiple functions: viewing decks, interior conditioned gathering spaces, private office space, private party rooms, and Austin FC game-watching parties. 

In addition, three 40-foot-tall containers, placed on their ends, function as wayfinders from afar. They also include restroom facilities and electrical rooms on the ground level.

On the Building Team: 
Developer: Karlin Real Estate
Architect: Mark Odom Studio 
Landscape architect: TBG Partners
Builder: Austin Commercial and Citadel Development Services
Fabricator: Makehaus Design and Fabrication Studio
MEP engineer: Bay & Associates, Inc.
Structural engineer: Leap!Structures
Civil engineer: LandDev Consulting
Container consultant: Falcon Structures

The Pitch ext 2
Courtesy Casey Dunn.
The Pitch int
Courtesy Casey Dunn.
The Pitch int 2
Courtesy Casey Dunn.

 

Related Stories

| Aug 11, 2010

Cost of HVAC equipment to remain flat in 2009, says Turner

While some manufacturers have announced slight increases in facilities equipment pricing for 2009, the average cost of equipment is expected to remain flat in 2009, according to the 2009 Turner Logistics Equipment Cost Index. However, equipment pricing could face increased pressure if there is a further decline in market demand.

| Aug 11, 2010

CityCenter projects get LEED Gold

MGM Mirage and Infinity World Development have received LEED Gold certification for the first three CityCenter projects: the ARIA Resort hotel tower, ARIA Resort convention center and theater, and the Vdara Hotel (above). The CityCenter developers anticipate Gold or Silver LEED certification for the project's remaining developments, which include a Mandarin Oriental hotel, a 500,000-sf retail a...

| Aug 11, 2010

BIG beats out Foster and Hadid in design competition for Kazakhstan's National Library

Invited as one of five pre-selected architect-led teams that included Lord Norman Foster and Zaha Hadid, Copenhagen-based BIG was awarded first prize in an international design competition for the new National Library in Astana, Kazakhstan. The 33,000-square-meter facility will be organized as a “circular loop of knowledge” that allows for clear, intuitive orientation of the vast co...

| Aug 11, 2010

Connecticut high school gets a expansion and renovation

The Morganti Group, Danbury, Conn., is managing the construction of a $41 million addition and renovation project at Newtown (Conn.) High School. Designed by Fletcher Thompson, Shelton, Conn., the project consists of a 70,000-sf addition and 30,000 sf of renovations to the gymnasium and interior spaces.

| Aug 11, 2010

Philadelphia cancer center seeks LEED certification

The New York office of Thornton Tomasetti provided structural engineering services for the Ruth and Raymond Perelman Center for Advanced Medicine in Philadelphia, a $232 million medical research center and advanced treatment center for cancer and cardiovascular disease. Designed by a joint venture of Perkins Eastman Architects and Rafael Vinõly Architects, the 340,000-sf facility will hous...

| Aug 11, 2010

Broadway-style theater headed to Kentucky

One of Kentucky's largest performing arts venues should open in 2011—that's when construction is expected to wrap up on Eastern Kentucky University's Business & Technology Center for Performing Arts. The 93,000-sf Broadway-caliber theater will seat 2,000 audience members and have a 60×24-foot stage proscenium and a fly loft.

| Aug 11, 2010

Office developer offers prebuilt units

Metropole Realty Advisors, owner and developer of the newly renovated 681 Fifth Avenue office building in Manhattan's Plaza District, has created a 6,000-sf, full-floor prebuilt unit that functions as both a model unit and built space for tenants unwilling to incur the cost of a build out. Designed by MKDA Designs, the space features contemporary finishes, 14-foot ceilings, and warm, neutral to...

| Aug 11, 2010

People+Firms

| Aug 11, 2010

Citizenship building in Texas targets LEED Silver

The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.

| Aug 11, 2010

Brooklyn's tallest building reaches 514 feet

With the Brooklyner now topped off, the 514-foot-high apartment tower is Brooklyn's tallest building. Designed by New York-based Gerner Kronick + Valcarcel Architects and developed by The Clarett Group, the soaring 51-story tower is constructed of cast-in-place concrete and clad with window walls and decorative metal panels.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021