Austin’s historic Rainey Street is welcoming a new neighbor. The Paseo, a 48-story mixed-used residential tower, will bring 557 apartments and two levels of retail to the popular Austin entertainment district, known for houses that have been converted into bungalow bars and restaurants. The Paseo’s groundbreaking took place in late February.
The project is located at an infill site on Rainey Street that was previously used as a food-truck lot. The development preserves and incorporates two historic bungalows that have operated as bars and now will serve as commercial space. Masonry brickwork on the building podium also connects the building with its neighborhood.
In addition to the Paseo’s street-facing retail and restaurants, the high-rise tower’s ground floor includes alcoves in the building’s street frontage to create social space and allow for sidewalk cafes. Between the main building and the bungalows, a landscaped garden and walkway connect Rainey Street to the riverfront park and trails.
The above-ground parking garage features a plant-lined masonry façade. A series of staggered setbacks atop the parking podium open up to an amenity deck providing views of the city and Lady Bird Lake. The project aims to reduce vehicle traffic loads on Rainey Street by moving vehicular access, loading, and pick-up away from the street.
Above the garage podium, the residential tower features patterned glass and protruding balconies intended to reflect the dynamic atmosphere of Rainey Street. The residential levels “are arranged in staggered tiers that seem to organically erode into the building mass,” according to a statement from the development’s architect, Pappageorge Haymes Partners.
The Paseo offers 10% onsite affordable housing and preserves most of the existing onsite trees. The project also includes 34,000 sf of building amenities.
The development is scheduled for completion in 2025.
On the Building Team:
Owner /developer: LV Collective
Architect: Pappageorge Haymes Partners
MEP engineer: Blum Consulting Engineers, Inc.
Structural engineer: DCI Engineers
General contractor/construction manager: JE Dunn Construction Company
Landscape Architect: TBG Partners
Related Stories
| Dec 31, 2013
BD+C's top 10 stories of 2013
The world's tallest twisting tower and the rise of augmented reality technology in construction were among the 10 most popular articles posted on Building Design+Construction's website, BDCnetwork.com.
| Dec 27, 2013
$1 billion 'city within a city' development approved by Coachella, Calif., city council
The mega development includes 7,800 homes, a retail center, office space, and nearly 350 acres of open space.
| Dec 23, 2013
MBI commends start of module setting at B2, world's tallest modular building
The first modules have been set at B2 residential tower at Atlantic Yards in New York, set to become the tallest modular building in the world.
| Dec 20, 2013
Can energy hogs still be considered efficient buildings? Yes, say engineers at Buro Happold
A new tool from the engineering firm Buro Happold takes into account both energy and economic performance of buildings for a true measure of efficiency.
| Dec 13, 2013
Safe and sound: 10 solutions for fire and life safety
From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies.
| Dec 10, 2013
16 great solutions for architects, engineers, and contractors
From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.
| Dec 4, 2013
First look: Dubai's winning bid for World Expo 2020 [slideshow]
Dubai has been chosen as the site of the 2020 World Expo. HOK led the design team that developed the master plan for the Expo, which is expected to draw more than 25 million visitors from October 2020 through April 2021.
| Nov 27, 2013
Exclusive survey: Revenues increased at nearly half of AEC firms in 2013
Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.
| Nov 27, 2013
Wonder walls: 13 choices for the building envelope
BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina.
| Nov 26, 2013
Construction costs rise for 22nd straight month in November
Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.