flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Austin mixed-use development will provide two million sf of office, retail, and residential space 

Mixed-Use

Austin mixed-use development will provide two million sf of office, retail, and residential space 

In addition to three office buildings and four multifamily buildings, the seven-building East Riverside Gateway complex will emphasize the pedestrian experience.


By Novid Parsi, Contributing Editor | March 11, 2023
Austin mixed-use development will provide two million sf of office, retail, and residential space Renderings courtesy Steinberg Hart
Renderings courtesy Steinberg Hart

In Austin, Texas, the seven-building East Riverside Gateway mixed-use development will provide a mixed-use community next to the city’s planned Blue Line light rail, which will connect the Austin Bergstrom International Airport with downtown Austin.

Planned and designed by Steinberg Hart, the development will include over 2 million sf of office, retail, and residential space, as well as amenities, such as a large park, that are intended to draw tech workers and young families. Currently home to a storage facility and a former mobile home park, the 22.5-acre triangular site is located at the terminus of the Riverside corridor. 

The three office buildings will be placed around a central plaza. The four multifamily buildings will provide 1,100 residential units at a range of prices, from high-end condos to larger residences, in addition to more compact, attainable units and affordable housing. All seven buildings will be connected through a ground-floor retail corridor. The project also will have 4,000 parking spaces. 

The master plan for the mixed-use development emphasizes the pedestrian experience, creating a walkable neighborhood and retaining the site’s numerous trees. The 3.5-acre urban park, which straddles the new development and its existing neighborhood, includes an area dedicated to the restoration of the area’s native Blackland Prairie habitat. Aiming to draw in pedestrians, the park’s programming will seek to inspire outdoor activities with a trailhead, bike path, playground, dog runs, and an outdoor pavilion area that can house events and performances. 

The buildings will feature solar shading to minimize heat gain, double-height porches, and balconies. And landscaping at the podium level and throughout the neighborhood should provide a cooling reprieve from the Texas heat.

East Riverside Gateway is currently in the entitlement phase. 

On the Building Team:
Owner (land): Artesia Real Estate 
Developer: PlaceMKR  
Design architect: Steinberg Hart
Landscape architect: dwg. 
Preconstruction services (residential and office buildings): Bartlett Cocke, Austin Commercial, DCI Engineers, CEC, and V3 Consulting Engineers

Steinberg Hart_East Riverside Gateway_Rendering (5).png

 

Steinberg Hart_East Riverside Gateway_Rendering

Steinberg Hart_East Riverside Gateway_Rendering

Steinberg Hart_East Riverside Gateway_Site Plan_Modified

Steinberg Hart_East Riverside Gateway_Rendering

Steinberg Hart_East Riverside Gateway_Rendering

 

 

 

 

 

Related Stories

Mixed-Use | Mar 1, 2017

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

The ground-up development will feature 255 hotel rooms and 69 residential units.

Mixed-Use | Feb 27, 2017

Tallest tower in Miami to begin construction in January 2019

The tower will reach a height of 1,049 feet, the maximum height permitted by the FAA in Miami.

Mixed-Use | Feb 23, 2017

5-tower scheme revealed for Zhengzhou, China

The towers will vary in height and emerge from a shared retail podium.

Mixed-Use | Feb 22, 2017

Hunt Development Group selected to spearhead Cabrini-Green redevelopment

The Chicago Housing Authority selected the firm to develop mixed-income housing and retail space where the infamous housing project once stood.

Mixed-Use | Feb 21, 2017

Coconut Grove’s newest mixed-use development springs from a converted parking garage

Terra says the development will be the first newly built office building in central Coconut Grove in over 20 years.

High-rise Construction | Feb 17, 2017

Zaha Hadid Architects-designed building to have the world’s tallest atrium

A 190-meter atrium will rise the full height of the building between two twisting sections.

Mixed-Use | Feb 8, 2017

Santiago Calatrava’s first major UK project will be the heart of the Greenwich Peninsula transformation

Peninsula Place will cost £1 billion and act as a gateway to the new, master-planned district.

Mixed-Use | Feb 7, 2017

Traditional Arab architecture and the surrounding mountainous terrain inspire a luxury hotel in Mecca

The Foster + Partners-designed building will address the shortage of accommodation in Mecca.

High-rise Construction | Jan 26, 2017

Paris tower provides office space and three hotel complexes across its three superimposed volumes

Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.

Mixed-Use | Jan 26, 2017

New renderings provide glimpse into large mixed-use project, Circa

The $500 million complex will begin pre-leasing in winter, 2017 and open for move-in early in 2018. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021