flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Austin adaptive reuse project transforms warehouse site into indoor-outdoor creative office building

Office Buildings

Austin adaptive reuse project transforms warehouse site into indoor-outdoor creative office building

Landscaped courtyard doubles as multitenant corridor and source of daylight.


By Peter Fabris, Contributing Editor | July 19, 2022
Gensler Fifth Tillery ext 1
Courtesy Matt Neimann

Fifth and Tillery, an adaptive reuse project, has revitalized a post-industrial site in East Austin, Texas. Limited to the footprint of an existing warehouse, the site has been reimagined as a vibrant indoor-outdoor creative office building.

The design inverts the typical office environment by bringing pedestrian circulation outdoors, which reduces energy demand and promotes tenant wellbeing. An inviting entry plaza serves as an outdoor lobby. Oriented to the south, the plaza invites predominant breezes into a landscaped courtyard that doubles as a multitenant corridor and source of daylight.

The site features a central green corridor and rain garden inspired by the native ravine microhabitats of Central Texas. An onsite reclaimed water system captures roof runoff, directing it to the raingarden and water feature that runs through the campus.

Integration of nature throughout the property draws users into common spaces, creating a dynamic social environment that encourages chance connections and spontaneous collaboration. A large social stairway promotes active design and can also function as an auditorium for community events. Floor-to-ceiling windows line the shaded courtyard, and a north-facing elevation maximizes views of the landscape.

Punched openings balance daylight and heat gain along the east and west facing facades. Bolstering the building’s sustainability, an overhead photovoltaic array and covered walkways provide shade. To improve air quality, integrated louvers with fresh air fans were placed around the courtyard where landscape and breezes provide natural filtration. The expansive photovoltaic array helps reduce the building’s embodied and operational carbon footprint.

The architectural theme is utilitarian and natural, with a simple palette of industrial materials layered onto a hybrid timber structure that blends seamlessly into neighboring districts. Complimentary materials—left-over glulam segments—were used as benches that mirror the beams of the primary structure. Prominently placed cisterns at the building’s entry reflects the site’s industrial history and emphasis on sustainable design.

On the building team:
Owner and/or developer: CIM Group
Design architect: Gensler
Architect of record: Gensler
MEP engineer: Arete
Structural engineer: MJ Structures
General contractor/construction manager: RM Chiapas

Gensler Fifth Tillery int 1
Courtesy Matt Neimann
Gensler Fifth Tillery int 2
Courtesy Matt Neimann
Gensler ext 2
Courtesy Ryan Conway.
Gensler Fifth Tillery int 3
Courtesy Ryan Conway.

 

Related Stories

Office Buildings | Jul 23, 2015

Office bust hits suburban Washington D.C.: metro area awash in vacant office buildings

Most of the building and buying is happening within the city’s limits.

Office Buildings | Jul 21, 2015

Finally! There's a workplace trend that’s worth embracing

There’s a realization by corporate real estate executives that in order to create a successful workplace, there must be alignment between their people, their place, and the tools they have to do their jobs.

High-rise Construction | Jul 20, 2015

Morphosis' Casablanca Finance City tower to be topped with crown-shaped pinnacle

The tower will anchor a new business district being planned, similar to the glass and concrete business La Défense section at the outskirts of Paris.

Office Buildings | Jul 15, 2015

BIG’s design for Philadelphia Navy Yard defies gravity

Ground has broken for 1200 Interpid, a 94,000-sf office building designed by BIG that appears to be leaning.

High-rise Construction | Jul 13, 2015

Herzog & de Meuron’s triangle tower stirs controversy in Paris

The 590-foot glass pyramid building will include a 120-room hotel, 754,000 sf of office space, and cultural facilities.

High-rise Construction | Jul 7, 2015

Bjarke Ingels designs Frankfurt skyscraper with a surprise in the middle

Several levels in the center of the 185-meter tower are shifted outward to allow for terraces with city views.

Office Buildings | Jun 30, 2015

'What’s the latest trend in workplace design?': How architects and designers should answer this hot-button question

Hint: Your response must be better than a laundry list of solutions, according to VOA Associates' John Varholak.

Museums | Jun 28, 2015

Manhattan's New Museum debuts first museum-led incubator space

Part studio, part shared workplace, part lab, and part professional development program, NEW INC connects design with technology, the arts with the market, students with seasoned practitioners, and the museum with the world.

High-rise Construction | Jun 23, 2015

The world's best new skyscrapers for 2015

One World Trade Center and Abu Dhabi's Burj Mohammed Bin Rashid Tower are among the four towers named Best Tall Buildings by the Council on Tall Buildings and Urban Habitat.

Office Buildings | Jun 18, 2015

How tech firms use real estate for competitive advantage

The tech sector is the top industry leasing office space in the U.S., accounting for 20% of major leasing activity in 2014. Dina Belon of Paladino and Company shares how these firms are using their real estate to go up against their competitors.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021