flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Atlanta’s largest adaptive reuse project features cross laminated timber

Building Team

Atlanta’s largest adaptive reuse project features cross laminated timber

Includes flexible-stay, hospitality/living building with long- and short-term options.


By Peter Fabris, Contributing Editor | May 6, 2022
619 Ponce Ext
Courtesy TILTPIXEL

Global real estate investment and management firm Jamestown recently started construction on more than 700,000 sf of new live, work, and shop space at Ponce City Market. Located in Atlanta’s Old Fourth Ward neighborhood, the property is undergoing the city’s largest ever adaptive reuse project.

619 Ponce, a four-story mass timber loft office building, includes 90,000 sf of office space and 23,000 sf of ground-level retail space. Cross-laminated timber for this portion of the project will be sourced from sustainably managed forests in Georgia and Alabama, including from timberland properties Jamestown owns and manages.

Ponce City Market opened in 2015. The latest phase of construction is designed with a focus on sustainability and wellness, according to a news release. The additions to the property will “evolve the mixed-used model and structured shopping experience through new prototype verticals, including a mass timber loft office building, new hospitality living concept, and a multi-family rental community designed for active adults and empty nesters,” the release says.

A 21-story, flexible-stay, hospitality living building will include 405 units and 12,000 sf of retail space with 21-foot ceilings. Designed for the way people live and work today, the hospitality living building will merge hospitality and home. It will include fully furnished units with flexible short-term and long-term stays, from by-the-night engagements to one-year terms and options in between. 

PCM_View02.jpg
The 21-story building will include 405 units and 12,000 sf of retail space with 21-foot ceilings. Courtesy TILTPIXEL

“The line between Airbnb and hotels, short-term and long-term rentals, is blurring,” said Michael Phillips, president, Jamestown. “The majority of people under 30 default to Airbnb and short-term stay rentals rather than hotels. People want the flexibility of short-term rentals with the service of a hotel. This concept caters to the global nomad and brings those two elements together.”

Signal House, the residential component, was designed for active adults and the 55+ cohort with a focus on health and wellness. It will provide a digitally integrated and socially supportive living experience for a non-digitally native demographic. One- to three-bedroom units will include clean, modern interiors and balconies. Micro-mobility features will include onsite bike and scooter parking, additional bike lanes, designated rideshare drop-off sites, electric bike and car share programs, and electric car charging stations.

The project will reduce its emissions through all-electric operations and efficient building systems. Jamestown will evaluate options for on-site and off-site renewables and carbon offsets to achieve net-zero carbon operations.

When completed, Ponce City Market will house some 100 businesses collectively employing more than 5,750 people and will include over 800 residences.
 

Building team:
 

619 Ponce & Signal House buildings

Design Architect and Architect of Record: Handel Architects 
MEP engineer: Integral Group
Structural engineer (base building): DeSimone Consulting Engineers                                                                                              Structural engineer (mass timber): StructureCraft
General contractor/construction manager: JE Dunn

 

Hospitality/living building

Design Architect / AOR: Handel Architects
Interior Designer: Mithun
MEP: Integral Group
Structural: DeSimone Consulting Engineers
General contractor/construction manager: JE Dunn

619 Ponce Interior
Courtesy Neoscape.
Skyline Park
Courtesy Jamestown.
Posman Books
Courtesy Jamestown.
Ponce City Market
Courtesy Jamestown.

 

Related Stories

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Populous selected to design 'crystalline skin' stadium for 2014 Winter Olympics

Russian officials have selected global architect Populous to design the main stadium for the 2014 Winter Olympic and Paralympic Games in Sochi, Russia. The 40,000-seat stadium will feature a crystalline skin that "engages with its surroundings by day and provides an iconic representation of the color and spectacle of the games when illuminated at night," said Populous senior principal John Barrow.

| Aug 11, 2010

Skanska completes $74 million Harbor Towers project six months ahead of schedule

Skanska USA Building Inc. announced the completion of a $74 million rehabilitation project at Harbor Towers, a 40-story luxury condominium complex comprising two towers located on Boston’s waterfront. Skanska served as Program Manager and oversaw the repair and replacement work that dramatically enhanced the reliability, cost-effectiveness, and energy efficiency of the buildings’ MEP systems.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021