flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Energy-efficiency program to improve 13 senior residential care facilities and save nearly $18 million.


By By BD+C Staff | February 10, 2012

As part of its effort to provide safe and affordable public housing to area seniors, the Atlanta Housing Authority (AHA) Board of Commissioners has selected Johnson Controls to begin energy-efficiency upgrades to nearly 2,000 units across 13 senior residential care facilities.

This is a component of an energy-savings program to improve the housing authority’s energy usage, reduce operational costs, minimize its environmental impact, and improve the comfort of its residents. The program is expected to save AHA nearly $18 million over the next 20 years, and will be paid for by energy savings so that no upfront costs will be paid by the housing authority.

More than 80 percent of the labor required for the execution of this project will come from local contractors and suppliers, including minority business enterprises. Additionally, employment opportunities for AHA residents will be created during construction, under the U.S. Department of Housing and Urban Development Section 3 program.

The contract calls for several areas of focus: the installation of new heating, ventilation and air conditioning equipment to improve heating and overall building efficiencies; weatherization to reduce heat loss while lowering energy costs; and water conservation and bathroom-fixture upgrades, designed to enhance user experience and minimize overall water consumption. In addition, Johnson Controls will provide energy conservation training for staff and residents.

The program is funded through an energy performance contract with Johnson Controls, which will help the housing authority significantly reduce their utility costs and carbon footprint without increasing operating budgets. The cost savings generated will repay the project capital investment over the term of the contract. BD+C

Related Stories

| Oct 12, 2011

Bulley & Andrews celebrates 120 years of construction

The family-owned and operated general contractor attributes this significant milestone to the strong foundation built decades ago on honesty, integrity, and service in construction. 

| Oct 12, 2011

Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health

  Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will

| Oct 11, 2011

AIA introduces five new documents for use on sustainable projects

These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand.

| Oct 11, 2011

Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center

  For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment. 

| Oct 11, 2011

ThyssenKrupp elevator cabs validated by UL Environment

The conclusive and independent third-party validation process is another step toward a green product line.

| Oct 11, 2011

Ballard Spahr launches real estate recovery group

  The new group represents an expansion of the company’s Distressed Real Estate Initiative, which was launched in 2008 to help clients throughout the country plan, adapt and prosper in a challenging economic environment. 

| Oct 11, 2011

Onex completes investment in JELD-WEN

With the completion of the JELD-WEN investment, Onex Partners III is approximately 40% invested.

| Oct 7, 2011

GREENBUILD 2011: Demand response partnership program announced at Greenbuild 2011

  Program will use USGBC’s newly revised LEED Demand Response credit as an implementation guideline and leverage its relationships with the building community to foster adoption and participation in existing utility and solution provider demand response offerings. 

| Oct 7, 2011

GREENBUILD 2011: Otis Elevator announces new contracts for sustainable building projects

  Wins reinforce Otis’ position as leader in energy-efficient products.

| Oct 7, 2011

GREENBUILD 2011: UL Environment releases industry-wide sustainability requirements for doors

  ASSA ABLOY Trio-E door is the first to be certified to these sustainability requirements.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021