flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Energy-efficiency program to improve 13 senior residential care facilities and save nearly $18 million.


By By BD+C Staff | February 10, 2012

As part of its effort to provide safe and affordable public housing to area seniors, the Atlanta Housing Authority (AHA) Board of Commissioners has selected Johnson Controls to begin energy-efficiency upgrades to nearly 2,000 units across 13 senior residential care facilities.

This is a component of an energy-savings program to improve the housing authority’s energy usage, reduce operational costs, minimize its environmental impact, and improve the comfort of its residents. The program is expected to save AHA nearly $18 million over the next 20 years, and will be paid for by energy savings so that no upfront costs will be paid by the housing authority.

More than 80 percent of the labor required for the execution of this project will come from local contractors and suppliers, including minority business enterprises. Additionally, employment opportunities for AHA residents will be created during construction, under the U.S. Department of Housing and Urban Development Section 3 program.

The contract calls for several areas of focus: the installation of new heating, ventilation and air conditioning equipment to improve heating and overall building efficiencies; weatherization to reduce heat loss while lowering energy costs; and water conservation and bathroom-fixture upgrades, designed to enhance user experience and minimize overall water consumption. In addition, Johnson Controls will provide energy conservation training for staff and residents.

The program is funded through an energy performance contract with Johnson Controls, which will help the housing authority significantly reduce their utility costs and carbon footprint without increasing operating budgets. The cost savings generated will repay the project capital investment over the term of the contract. BD+C

Related Stories

| Dec 9, 2011

BEST AEC FIRM 2011: HMC Architects

Fostering a tradition of collaboration.

| Dec 9, 2011

BEST AEC FIRM 2011: Gensler

Developing talent on a global scale.

| Dec 9, 2011

BEST AEC FIRM 2011: Chapman Construction/Design

Taking sustainable practices to heart.

| Dec 9, 2011

BEST AEC FIRMS 2011: EYP Architecture & Engineering

Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.

| Dec 8, 2011

Keast & Hood Co. part of Statue of Liberty renovation team

Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty. 

| Dec 8, 2011

HDR opens office in Shanghai

The office, located in the Chong Hing Finance Center in Shanghai’s busy Huangpu District, will support HDR’s design efforts throughout Asia. 

| Dec 8, 2011

HOK elevates the green office standard

Firm achieves LEED Platinum certification in New York office that overlooks Bryant Park.

| Dec 7, 2011

ACE Mentor Program receives Presidential Award for Excellence in Science, Math and Engineering Mentoring

Thornton Tomasetti founding principal Charles H. Thornton responsible for launching ACE.

| Dec 7, 2011

NSF International qualifies first wallcoverings distributor to the New American National Standard for Sustainable Wallcoverings

TRI-KES demonstrates leadership in environmental stewardship as the first distributor to earn qualification.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021