flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Energy-efficiency program to improve 13 senior residential care facilities and save nearly $18 million.


By By BD+C Staff | February 10, 2012

As part of its effort to provide safe and affordable public housing to area seniors, the Atlanta Housing Authority (AHA) Board of Commissioners has selected Johnson Controls to begin energy-efficiency upgrades to nearly 2,000 units across 13 senior residential care facilities.

This is a component of an energy-savings program to improve the housing authority’s energy usage, reduce operational costs, minimize its environmental impact, and improve the comfort of its residents. The program is expected to save AHA nearly $18 million over the next 20 years, and will be paid for by energy savings so that no upfront costs will be paid by the housing authority.

More than 80 percent of the labor required for the execution of this project will come from local contractors and suppliers, including minority business enterprises. Additionally, employment opportunities for AHA residents will be created during construction, under the U.S. Department of Housing and Urban Development Section 3 program.

The contract calls for several areas of focus: the installation of new heating, ventilation and air conditioning equipment to improve heating and overall building efficiencies; weatherization to reduce heat loss while lowering energy costs; and water conservation and bathroom-fixture upgrades, designed to enhance user experience and minimize overall water consumption. In addition, Johnson Controls will provide energy conservation training for staff and residents.

The program is funded through an energy performance contract with Johnson Controls, which will help the housing authority significantly reduce their utility costs and carbon footprint without increasing operating budgets. The cost savings generated will repay the project capital investment over the term of the contract. BD+C

Related Stories

| Sep 8, 2022

U.S. construction costs expected to rise 14% year over year by close of 2022

Coldwell Banker Richard Ellis (CBRE) is forecasting a 14.1% year-on-year increase in U.S. construction costs by the close of 2022.

Giants 400 | Sep 7, 2022

Top 95 Industrial Sector Architecture + AE Firms for 2022

Ware Malcomb, Stantec, Haskell, and Macgregor Associates Architects top the ranking of the nation's largest industrial facility sector architecture and architecture/engineering (AE) firms for 2022, as reported in Building Design+Construction's 2022 Giants 400 Report.

| Sep 7, 2022

Use of GBCI building performance tools rapidly expanding

More than seven billion square feet of project space is now being tracked using Green Business Certification Inc.’s (GBCI’s) Arc performance platform.

| Sep 7, 2022

K-8 school will help students learn by conducting expeditions in their own communities

In August, SHP, an architecture, design, and engineering firm, broke ground on the new Peck Expeditionary Learning School in Greensboro, N.C. Guilford County Schools, one of the country’s 50 largest school districts, tapped SHP based on its track record of educational design.

| Sep 6, 2022

Herbert V. Kohler, Jr. (1939-2022) An incomparable spirit

Dynamic leader and Kohler Co. Executive Chairman Herbert Vollrath Kohler, Jr. passed away on September 3, 2022, in Kohler, Wisconsin.

| Sep 6, 2022

Demand for flexible workspace reaches all-time high

Demand for flexible workspace including coworking options has never been higher, according to a survey from Yardi Kube, a space management software provider that is part of Yardi Systems.

| Sep 2, 2022

Converting office buildings to apartments is cheaper, greener than building new

Converting office buildings to apartments is cheaper and greener than tearing down old office properties and building new residential buildings.

| Sep 2, 2022

New UMass Medical School building enables expanded medical class sizes, research labs

  A new nine-story, 350,000 sf biomedical research and education facility under construction at the University of Massachusetts Chan Medical School in Worcester, Mass., will accommodate larger class sizes and extensive lab space.

Architects | Sep 1, 2022

BNIM promotes Jeremy Knoll to Director of Sustainability and Regenerative Design

BNIM'S Jeremy Knoll promoted to Director of Sustainability and Regenerative Design.

Giants 400 | Sep 1, 2022

Top 160 K-12 School Architecture + AE Firms for 2022

PBK, DLR Group, Huckabee, and Stantec head the ranking of the nation's largest K-12 school sector architecture and architecture/engineering (AE) firms for 2022, as reported in Building Design+Construction's 2022 Giants 400 Report.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021