The new Home of the Braves has its name: SunTrust Park.
Committed to building the communities they serve, Atlanta-based SunTrust Banks, Inc. and the Atlanta Braves today announced a partnership for the naming rights of the new Home of the Braves, slated to open in the spring of 2017. The development will be the first of its kind—a destination that combines a state-of-the-art Major League Baseball ballpark with a simultaneously constructed multi-use community including unique shops, restaurants, offices, and residences.
The name of the park was announced in conjunction with a groundbreaking ceremony held today. Developed by the Braves in partnership with the Cobb-Marietta Coliseum and Exhibit Hall Authority, SunTrust Park will be constructed by American Builders 2017, a joint venture between Brasfield & Gorrie, Mortenson Construction, Barton Malow Company and New South Construction.
Construction will be completed by Opening Day 2017. Located in Atlanta at the intersection of I-75 and I-285 in the bustling Cumberland CID, SunTrust Park will flow directly into the surrounding development, creating a vibrant atmosphere with unique shops, restaurants and entertainment venues that is accessible 365 days a year, not only on Braves game days.
“The new ballpark constitutes a new chapter in Atlanta Braves baseball, and we are excited that SunTrust has decided to build upon our decades-long relationship and embark on this journey with us,” said Atlanta Braves Chairman and CEO Terry McGuirk. “Both of our organizations have deep roots in Atlanta and loyal fans throughout the Southeast and across the nation. We couldn’t imagine a more perfect partner and look forward to seeing the first pitch at SunTrust Park in 2017.”
For more information, visit www.HomeoftheBraves.com.
Related Stories
| May 15, 2012
SAGE Electrochromics to become wholly owned subsidiary of Saint-Gobain
This deal will help SAGE expand into international markets, develop new products and complete construction of the company’s new, state-of-the-art manufacturing facility in Faribault, Minn.
| May 14, 2012
Codes harvest rainwater
IAPMO’s Green Plumbing and Mechanical Code Supplement could make rainwater harvesting systems commonplace by clearly outlining safe installation and maintenance practices.
| May 14, 2012
Plumbing research coalition to study drainline transport issue
The effort is aimed at determining if decreasing levels of water flow––caused by increasingly efficient plumbing fixtures––are sufficient to clear debris from plumbing pipes.
| May 14, 2012
SOM to break ground on supertall structure in China
The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.
| May 14, 2012
Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons
Supertall two-tower complex located in Seoul’s Yongsan International Business District.
| May 14, 2012
SMPS and Deltek announce alliance
A/E/C industry leaders partner to advance technology’s role in design firm marketing and business development.
| May 14, 2012
ArchiCAD e-Specs integration unveiled
Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.
| May 11, 2012
2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution
Download the complete White Paper, Chapters 1-10
| May 11, 2012
Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings
We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.
| May 11, 2012
Chapter 9 The Key to Commissioning That Works? It Never Stops
Why commissioning for existing and renovated buildings needs to be continuous to be effective.