flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ASHRAE standard aims for consistency in measuring building energy use

ASHRAE standard aims for consistency in measuring building energy use

Standard aims to make it easier to compare efficiency of buildings


By BD+C Staff | April 4, 2014
Photo: Feelart via FreeDigitalPhotos.net
Photo: Feelart via FreeDigitalPhotos.net

The newly revised ANSI/ASHRAE Standard 105-2014, Standard Methods of Determining, Expressing, and Comparing Building Energy Performance and Greenhouse Gas Emissions, is intended to provide consistency in reporting the energy performance of existing or proposed buildings.

The standard answers such questions as: Should the measurements of a building’s area used in the equation to derive energy use per square foot be taken from the exterior dimensions or to the centerline of the wall? And, should storage spaces be included even though they are unoccupied?

“A standard method of measurement is needed to compare one building’s energy use to another,” says Keith Emerson chair of the Standard 105 committee. “For instance, comparing one building’s summer energy use to another building's winter use would be comparing apples and oranges.”

The standard provides a common basis for reporting building energy use in delivered energy forms and expressions of energy performance, and for comparing energy performance in terms of energy resources used and greenhouse gas emissions created—both across buildings and for energy efficiency measures within buildings. It also provides guidelines for comparing design options.

“To keep the standard flexible, a number of decisions are left to those who adopt it, including what should be calculated beyond site energy and the multipliers for those additional calculations,” Emerson said.

(https://www.ashrae.org/news/2014/revised-ashrae-standard-helps-to-compare-building-energy-performance)

Related Stories

Codes and Standards | Apr 27, 2021

Ten real estate groups sign on to New York State’s high-rise decarbonization challenge

Each signee commits to carbon neutrality in one or more high-rise buildings it owns.

Codes and Standards | Apr 26, 2021

Dozens of companies, organizations call for Congress to double Energy Star funding

Despite broad support, program’s budget has steadily declined in recent years.

Codes and Standards | Apr 22, 2021

Alabama fire chiefs oppose proposal to change school building code oversight

Bill would move code compliance control from state to local boards.

Codes and Standards | Apr 21, 2021

After dry winter, California ramps up wildfire prevention efforts

State to spend half a billion dollars on projects including making buildings more fire resistant.

Codes and Standards | Apr 20, 2021

U.S. electric grid is halfway to zero carbon

Other sectors including buildings lag power industry.

Codes and Standards | Apr 19, 2021

Failed landmark preservation effort in Chicago provides lessons for planners

Gentrification fears heightened among Pilsen neighborhood residents doomed ambitious preservation plan.

Codes and Standards | Apr 14, 2021

New Phase 1 Environmental Site Assessment standard debuts in 2021

Will affect 250,000 commercial real estate deals a year.

Codes and Standards | Apr 13, 2021

British Columbia moves to accelerate mass timber construction

Province funds demonstration projects as part of economic recovery.

Codes and Standards | Apr 12, 2021

WoodWorks and Think Wood release first Mass Timber Design Manual

Interactive collection of information on mass timber products, design best practices, taller wood construction and sustainability.

Codes and Standards | Apr 8, 2021

Sensors used in tunable lighting systems found to have high reliability

DOE study investigated items used to control lumen depreciation, chromaticity shifts, and changes in drivers.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021