flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Codes and Standards

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Includes flush calculations to reduce time and energy to clear contaminants between occupancy periods.


By Peter Fabris, Contributing Editor | February 23, 2021

Courtesy Pixabay

The ASHRAE Epidemic Task Force has updated its reopening guidance for HVAC systems to help mitigate the transmission of the COVID-19 virus.

“The Building Readiness Guide includes additional information and clarifications to assist designers and commissioning providers in performing pre- or post-occupancy flush calculations to reduce the time and energy to clear spaces of contaminants between occupancy periods,” said Wade Conlan, ASHRAE Epidemic Task Force Building Readiness team lead, in a news release. “New information includes the theory behind the use of equivalent outdoor air supply, method for calculating the performance of filters and air cleaners in series, and filter droplet nuclei efficiency that help evaluate the systems’ ability to flush the building.”

There is now a link to a view-only Google Sheet that can be downloaded for use. This will help determine the available equivalent outdoor air changes and time to perform the flush. 

The guide now also includes data to consider for heating of outdoor air and the potential impact on pre-heat coils in systems.

Related Stories

Codes and Standards | Jul 22, 2020

Mobile app calculates sound transmission for wood-framed assemblies

American Wood Council tool for floor-ceiling assemblies.

Codes and Standards | Jul 22, 2020

Architecture billings remain in negative territory, begin to stabilize

Fewer architecture firms report declining billings this month.

Codes and Standards | Jul 20, 2020

N.Y. construction firm to pay $1.5 million to settle sexual harassment claim

Managers said to demand sex for pay and OT opportunities.

Codes and Standards | Jul 16, 2020

Tips to make optimal use of salvaged materials

Integrated teams, staging warehouse, and looking early and often, among recommendations.

Codes and Standards | Jul 15, 2020

Georgia gives the go-ahead for tall mass timber construction

Standards review scheduled to be completed by July 2021.

Codes and Standards | Jul 15, 2020

Softwood-lumber duties boost expenses amid COVID-19 outbreak

Little hope this year for resolution of trade dispute with Canada.

Codes and Standards | Jul 14, 2020

Metal Construction Assn. releases three EPD updates

Pertain to Metal Composite Materials, Insulated Metal Panels, and Roll Formed Aluminum and Steel Cladding.

Codes and Standards | Jul 13, 2020

5 must reads for the AEC industry today: July 13, 2020

4 technologies for improving building sanitation and tech's ever-evolving impact on the multifamily space.

Codes and Standards | Jul 9, 2020

Funding opportunity for field validation of high-impact building technologies

Dept. of Energy program targets dynamic interactions with electric grid.

Codes and Standards | Jul 8, 2020

Standards for reducing risk of COVID-19 in senior living communities

AIA releases strategies and illustrations for the sector.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021