flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Codes and Standards

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Includes flush calculations to reduce time and energy to clear contaminants between occupancy periods.


By Peter Fabris, Contributing Editor | February 23, 2021

Courtesy Pixabay

The ASHRAE Epidemic Task Force has updated its reopening guidance for HVAC systems to help mitigate the transmission of the COVID-19 virus.

“The Building Readiness Guide includes additional information and clarifications to assist designers and commissioning providers in performing pre- or post-occupancy flush calculations to reduce the time and energy to clear spaces of contaminants between occupancy periods,” said Wade Conlan, ASHRAE Epidemic Task Force Building Readiness team lead, in a news release. “New information includes the theory behind the use of equivalent outdoor air supply, method for calculating the performance of filters and air cleaners in series, and filter droplet nuclei efficiency that help evaluate the systems’ ability to flush the building.”

There is now a link to a view-only Google Sheet that can be downloaded for use. This will help determine the available equivalent outdoor air changes and time to perform the flush. 

The guide now also includes data to consider for heating of outdoor air and the potential impact on pre-heat coils in systems.

Related Stories

Codes and Standards | Mar 6, 2017

ConsensusDocs updates standard short contract editions

The updates address industry changes impacting insurance, legal, technology, and terminology.

Codes and Standards | Mar 3, 2017

ASCE updates standard for structures using tensile membrane

The new sstandard combines guidelines for conventional tensile membrane structures with frame-covered membrane structures.

Codes and Standards | Mar 1, 2017

EPA's 2017 Construction General Permit now in effect

The regulation governs compliance with effluent limits.

Codes and Standards | Feb 28, 2017

Concern grows for high tide flood vulnerability in Mid-Atlantic states

Washington, D.C., and Annapolis, Md., could flood every three days by 2045.

Codes and Standards | Feb 27, 2017

Green building saves operating costs and boosts asset value

A new report shows 14% cost savings and a 7% increase in value when green standards are met.

Codes and Standards | Feb 24, 2017

Scant data hampering energy, water efficiency at sports venues

New NIBS report says baseline information needs further development.

Codes and Standards | Feb 22, 2017

Plans for WELL Building Standard include linkage with other green building standards

The planned updated version will be customizable for any building type.

Codes and Standards | Feb 21, 2017

Aging building code inspectors and government belt-tightening could cause crisis

Inspectors are edging toward retirement with no understudies in place.

Codes and Standards | Feb 20, 2017

AISI publishes three new cold-formed steel framing research reports

Seismic simulation, roof trusses, steel-to-steel and sheathing-to-steel connections are examined in the reports.

Codes and Standards | Feb 17, 2017

New energy design guide for metal building systems now available

The second edition incorporates more recent IECC and ASHRAE standards.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021