flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ASHRAE design contest winners demonstrate building resilience

Codes and Standards

ASHRAE design contest winners demonstrate building resilience

Model building, a city hall, could operate without utility service for two week.


By Peter Fabris, Contributing Editor | October 24, 2019

Courtesy Pixabay

Winners of ASHRAE’s 2019 LowDown Showdown modeling competition demonstrated both near energy net-zero attributes along with impressive resilience qualities.

The model building chosen was a 90,000 sf city hall (new construction) located in San Diego. This facility was designed to be a multi-functional building, housing many of the cities vital public services including an Emergency Operations Center during a disaster or crisis.

The facility could maintain operations for 14 days during a utility outage. It would support coordination of emergency responses while maintaining critical functions like prisoner life safety and security. The building can transition to a setback mode, minimizing energy consumption by relaxing thermal comfort targets. Building systems would draw energy from a 10,000 kWh battery system and a 427 KW PV array for power, and 10 kgal potable and 20 kgal non-potable water storage tanks.

The second-place team designed a new city hall with a three-story atrium to provide ample space for green walls, skylight, and natural breezes. The project included deployment of EnergyBox, an in-house web platform that speeds up design exploration by automating processes and encouraging collaboration by effective visualization.

Related Stories

Codes and Standards | May 20, 2019

Property lenders shouldn’t invest for 30 years in most of Florida, expert warns

Climate ignorance driving some ‘insane’ deals.

Codes and Standards | May 17, 2019

NIMBYism is the biggest multifamily construction barrier

National Apartment Assn. report assesses reasons for difficulty in creating more apartments.

Codes and Standards | May 17, 2019

Dept. of Energy to award up to $33.5 million for advanced construction R&D

Focus is on techniques to reduce energy bills.

Codes and Standards | May 16, 2019

Mixed reviews on targeted tax break for San Francisco neighborhood

“Twitter tax break” may have worsened some of the area’s problems.

Codes and Standards | May 15, 2019

OSHA inspections to increase, says Secretary of Labor

Newly hired inspectors getting up to speed.

Codes and Standards | May 14, 2019

Database records more than 1,360 K-12 school shooting incidents since 1970

Naval Postgraduate School program maps locations nationwide.

Codes and Standards | May 13, 2019

In many cities, downtown housing comes with a hefty premium

Urban core living costs hundreds of thousands more in largest U.S. cities.

Codes and Standards | May 7, 2019

San Francisco plan would require largest commercial buildings to use 100% renewable electricity

First in the U.S. mandate would be phased in from 2022 to 2030.

Codes and Standards | May 7, 2019

ABC says best practices can improve construction companies’ safety by 680%

Daily ‘toolbox safety talks’ were most effective safety measures.

Codes and Standards | May 7, 2019

Office noise significantly reducing employee concentration, productivity, and creativity

Workplace distractions cause some to choose to work remotely.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021