flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ASHRAE design contest winners demonstrate building resilience

Codes and Standards

ASHRAE design contest winners demonstrate building resilience

Model building, a city hall, could operate without utility service for two week.


By Peter Fabris, Contributing Editor | October 24, 2019

Courtesy Pixabay

Winners of ASHRAE’s 2019 LowDown Showdown modeling competition demonstrated both near energy net-zero attributes along with impressive resilience qualities.

The model building chosen was a 90,000 sf city hall (new construction) located in San Diego. This facility was designed to be a multi-functional building, housing many of the cities vital public services including an Emergency Operations Center during a disaster or crisis.

The facility could maintain operations for 14 days during a utility outage. It would support coordination of emergency responses while maintaining critical functions like prisoner life safety and security. The building can transition to a setback mode, minimizing energy consumption by relaxing thermal comfort targets. Building systems would draw energy from a 10,000 kWh battery system and a 427 KW PV array for power, and 10 kgal potable and 20 kgal non-potable water storage tanks.

The second-place team designed a new city hall with a three-story atrium to provide ample space for green walls, skylight, and natural breezes. The project included deployment of EnergyBox, an in-house web platform that speeds up design exploration by automating processes and encouraging collaboration by effective visualization.

Related Stories

Codes and Standards | Jan 3, 2020

Labor supply and capability of workers worry contractors

Three out of four firms plan to add workers in 2020.

Codes and Standards | Jan 3, 2020

Car-free streets could become common in major cities

New York and San Francisco establish thoroughfares dedicated to transit, pedestrians.

Codes and Standards | Jan 2, 2020

CRE professionals have increased interest in embodied carbon accounting, smart buildings

Survey also shows that interest in resiliency lags behind.

Codes and Standards | Jan 2, 2020

White paper focuses on Metal Composite Material labeling

Document part of effort to uphold industry standards for the product.

Codes and Standards | Dec 18, 2019

Hard Rock Hotel collapse in New Orleans puts spotlight on undocumented workers

Having helped rebuild the city after Hurricane Katrina, many under threat of deportation.

Codes and Standards | Dec 18, 2019

Maryland lawmakers take on blocked sidewalks during construction projects

Legislation clarifies developers’ responsibilities.

Codes and Standards | Dec 18, 2019

New York City passes legislation to prevent bird strikes on buildings

Requires bird-safe materials on first 75 feet of a structure.

Codes and Standards | Dec 16, 2019

New Buildings Institute seeks entries for Zero Buildings Database

Listing illustrates feasibility of ultra low-energy buildings.

Codes and Standards | Dec 13, 2019

USGBC launches new tool to prioritize sustainability strategies

Highlights building design features that can lead to better performance.

Codes and Standards | Dec 12, 2019

Coalition calls for consistent building data disclosure regulations in Canada

Major real estate firms are driving the effort.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021