flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ASHRAE design contest winners demonstrate building resilience

Codes and Standards

ASHRAE design contest winners demonstrate building resilience

Model building, a city hall, could operate without utility service for two week.


By Peter Fabris, Contributing Editor | October 24, 2019

Courtesy Pixabay

Winners of ASHRAE’s 2019 LowDown Showdown modeling competition demonstrated both near energy net-zero attributes along with impressive resilience qualities.

The model building chosen was a 90,000 sf city hall (new construction) located in San Diego. This facility was designed to be a multi-functional building, housing many of the cities vital public services including an Emergency Operations Center during a disaster or crisis.

The facility could maintain operations for 14 days during a utility outage. It would support coordination of emergency responses while maintaining critical functions like prisoner life safety and security. The building can transition to a setback mode, minimizing energy consumption by relaxing thermal comfort targets. Building systems would draw energy from a 10,000 kWh battery system and a 427 KW PV array for power, and 10 kgal potable and 20 kgal non-potable water storage tanks.

The second-place team designed a new city hall with a three-story atrium to provide ample space for green walls, skylight, and natural breezes. The project included deployment of EnergyBox, an in-house web platform that speeds up design exploration by automating processes and encouraging collaboration by effective visualization.

Related Stories

Codes and Standards | Jul 7, 2021

Bechtel, Nautilus partner on sustainable, high-performance data centers

Facilities would use 70% less power for cooling, eliminate consumption of drinking water.

Codes and Standards | Jul 7, 2021

Surfside condo collapse could spur new legislation

Natl. Institute of Standards and Technology is investigating.

Codes and Standards | Jul 7, 2021

Intl. Code Council appoints committees to lead energy code development

One-third of appointees are government regulators.

Codes and Standards | Jul 1, 2021

COVID-19 made payment delays to contractors much worse

Only one in ten companies is always getting paid in full.

Codes and Standards | Jun 30, 2021

New resource for public sector organizations to develop energy data management program

Dept. of Energy document contains more than 30 examples of successful implementations.

Codes and Standards | Jun 29, 2021

Biden China policy may spur more increased U.S. PV manufacturing capacity

Senate bill proposes advanced solar manufacturing production credit.

Codes and Standards | Jun 28, 2021

Local and state building energy performance standards aim to curb climate change

Owners must up the ante on operations and retrofits.

Codes and Standards | Jun 24, 2021

Biden Administration will restore ‘Waters of the U.S.’ protections ended by Trump

Early revision more likely to hold up in court, says legal expert.

Codes and Standards | Jun 23, 2021

Denver unveils renewable heating and cooling plan

City releases roadmap to decarbonizing existing homes and buildings.

Codes and Standards | Jun 22, 2021

Actually, few companies plan to significantly reduce their office footprint

CBRE survey shows that many firms will continue with hybrid work.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021