flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ASHRAE design contest winners demonstrate building resilience

Codes and Standards

ASHRAE design contest winners demonstrate building resilience

Model building, a city hall, could operate without utility service for two week.


By Peter Fabris, Contributing Editor | October 24, 2019

Courtesy Pixabay

Winners of ASHRAE’s 2019 LowDown Showdown modeling competition demonstrated both near energy net-zero attributes along with impressive resilience qualities.

The model building chosen was a 90,000 sf city hall (new construction) located in San Diego. This facility was designed to be a multi-functional building, housing many of the cities vital public services including an Emergency Operations Center during a disaster or crisis.

The facility could maintain operations for 14 days during a utility outage. It would support coordination of emergency responses while maintaining critical functions like prisoner life safety and security. The building can transition to a setback mode, minimizing energy consumption by relaxing thermal comfort targets. Building systems would draw energy from a 10,000 kWh battery system and a 427 KW PV array for power, and 10 kgal potable and 20 kgal non-potable water storage tanks.

The second-place team designed a new city hall with a three-story atrium to provide ample space for green walls, skylight, and natural breezes. The project included deployment of EnergyBox, an in-house web platform that speeds up design exploration by automating processes and encouraging collaboration by effective visualization.

Related Stories

Healthcare Facilities | Jun 10, 2016

Top 10 health technology hazards include some influenced by space design

ECRI Institute’s annual list includes operational and workflow issues.  

Codes and Standards | Jun 9, 2016

Supreme Court ruling could aid developers on properties containing wetlands

Unanimous decision allows landowners to take regulatory decisions straight to court.

Green | Jun 8, 2016

TD Bank Group's renovated Toronto office is first WELL-Certified project under WELL v1

The newly renovated 25,000-sf space achieved gold-level status.

Concrete | Jun 7, 2016

Concrete Institute publishes document providing concrete curing guidance

New curing monitoring techniques included.  

Energy | Jun 7, 2016

Energy modeling payback typically as short as one to two months

Energy modeling is a ‘no-brainer—like checking MPG on a car’

Green | Jun 2, 2016

USGBC offers new LEED pilot credit: Building Material Human Hazard and Exposure Assessment

For assessing human health-related exposure scenarios for construction products.

Resiliency | Jun 1, 2016

Federal agencies boost standards for more resilient construction

HUD, FEMA, GSA, Army Corps of Engineers make policy changes.    

Green | May 31, 2016

Miami Beach requires developers to meet green standards or pay a fee

Applies to structures larger than 7,000 sf.  

Codes and Standards | May 27, 2016

Better enforcement needed for successful implementation of energy efficiency policies

Commercial buildings the focus of recent code initiatives.  

Codes and Standards | May 25, 2016

LEED Dynamic is worth the effort, says commercial real estate executive

San Diego office tower is California’s first office building to receive LEED Dynamic plaque in recertification.  

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021