flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Art-focused hotel will be the first to open in the Dallas Arts District

Hotel Facilities

Art-focused hotel will be the first to open in the Dallas Arts District

HKS is designing the hotel.


By David Malone, Associate Editor | February 6, 2019
All images courtesy HALL Group.

HALL Arts Hotel will become the first hotel to open in the Dallas Arts District, the country’s largest contiguous urban arts district, when it opens to the public in fall 2019.

The HKS-designed hotel will include 183 modern guest rooms, which includes 10 Arts District-inspired suites; contemporary artwork from up to 50 local and international artists; over 6,000 sf of events space; a lounge and terrace that will host live music and entertainment; a rooftop pool; and two unique restaurants. The events space will include two multi-purpose salon spaces, the HALL Arts Boardroom, and a 1,737 square foot ballroom.

 

 

The 10-story building’s exterior will have a glass and steel jewel box design that fits in with the rest of the Dallas Art District’s architectural aesthetic. The hotel will rise adjacent to the HALL Arts Residences, a 28-story residential tower slated to open in early 2020.

 

See Also: CambridgeSeven named lead architect for new Cambria Hotel

 

In addition to HKS, Hall Group was the project developer and Bentel & Bentel handled interior design duties.

 

King guest room

 

Hall arts hotel bar and lounge

 

HALL arts hotel lounge

 

HALL arts hotel lobby

Related Stories

Hotel Facilities | Jan 30, 2017

New renderings of the 1966 Century Plaza Hotel’s redevelopment

The redevelopment project got underway last summer and is expected to be completed in 2018.

Hotel Facilities | Jan 25, 2017

New Denver hotel will integrate historic 130-year-old fire station into its design

The 1883 Denver Hose Company No.1 building will be fully restored as part of the project.

Modular Building | Jan 12, 2017

The largest modular construction hotel project in New York City is starting to get pieced together

The hotel’s 300 rooms are made from 210 prefabricated pods from Polcom Modular.

Hotel Facilities | Nov 15, 2016

Mountain Forest Hotel looks to restore the natural landscape while offering visitors 250 luxury rooms

The hotel looks to create a symbiosis between man, nature, and architecture.

Industry Research | Sep 28, 2016

Worldwide hotel construction shows modest year-over-year growth

Overall construction for hotel projects is up, but the current number of hotels currently being built has dipped slightly from one year ago.

Hotel Facilities | Sep 26, 2016

$75 million commercial tower and hotel proposed in downtown Atlanta

The tower would be built on a site currently occupied by a Hertz Car Rental and parking lot.

Sponsored | Coatings | Sep 22, 2016

Valspar helps diversify new project amongst iconic downtown Chicago buildings

The 26-story hotel spanning 96,000 square-feet needed a way to not only differentiate itself among the sea of other hotels and buildings lining the riverfront and downtown area, but also fit into the mix aesthetically.

Hotel Facilities | Sep 19, 2016

The Hotel at Oberlin becomes one of only five hotels to achieve LEED Platinum

The Hotel at Oberlin anchors the Peter B. Lewis Gateway Center, the cornerstone of Oberlin’s Green Arts District.

Hotel Facilities | Sep 15, 2016

Developer reveals plans for 175-room hotel across from Wrigley Field

The hotel will provide a four-star experience to guests during baseball season and, just as importantly, during the offseason.

Hotel Facilities | Sep 7, 2016

Fish out of water: The site of a Birdseye frozen-food factory in Gloucester, Mass., transforms into a seaside hotel

The construction of this 94-room hotel and conference center pitted tourism proponents against locals who want to preserve this historic city’s fishing heritage. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021