flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Arquitectonica's hairpin-shaped tower breaks ground in Miami

Arquitectonica's hairpin-shaped tower breaks ground in Miami

Rising above Biscayne Bay, the 305-meter tower will include three viewing decks, a restaurant, nightclub, and exhibition space.


By BD+C Staff  | September 17, 2014

SkyRise Miami, the city's soon-to-be tallest tower is now under construction, ArchDaily reports.

Rising above Biscayne Bay, the 305-meter tower will include three viewing decks, a restaurant, nightclub, and exhibition space. Its most unique feature, however, will be the chance for visitors to bungee jump off of its upper floors. 

Arquitectonica, who designed SkyRise, have said that they hope the tower will meet LEED Gold Standards when built. Construction is set to be completed in 2017. 

Here is the Arquitectonica's design statement:
A continuous sheet of translucent mesh rises one thousand feet from the bay to the sky. It wraps around a colossal atrium and descends dramatically, forming a sweeping curve. At its base the curve becomes a monumental canopy under which cascading steps create a performance amphitheater. The resultant form can be interpreted as a giant wave, or a billfish jumping out of the water, a giant fishing net, or even a flowing dress over a sensuous form. More simply, the curving silhouette references Miami’s tropicality.

Unlike other observation towers, Sky Rise Miami is asymmetrical. It is decidedly directional, facing the Caribbean and South America. It welcomes our visitors from the south into North America. It is our abstract version of the Statue of Liberty. A sculpture to view from afar, and also to explore within.

Also, unlike other observation towers, Sky Rise Miami is more than a viewing deck. It has content. A cluster of functional levels at its top contain multiple restaurants, shops, an event ballroom, an exhibit gallery, a soaring domed theatre, a night club, and a thrill ride that allows daring visitors to drop at high speed from the sky to the bay along its facade. It emphasizes current thinking that architecture is not only about form, but also about content.

 

Related Stories

| Nov 29, 2011

Turner Construction establishes partnership with Clark Builders

Partnership advances growth in the Canadian marketplace.

| Nov 29, 2011

AIA launches stalled projects database

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 28, 2011

Armstrong acquires Simplex Ceilings

Simplex will become part of the Armstrong Building Products division.

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

| Nov 23, 2011

Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas

Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.

| Nov 23, 2011

Griffin Electric completes Gwinnett Tech project

Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.

| Nov 22, 2011

Corporate America adopting revolutionary technology

The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector. 

| Nov 22, 2011

Report finds that L.A. lags on solar energy, offers policy solutions

Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.

| Nov 22, 2011

Saskatchewan's $1.24 billion carbon-capture project

The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021