SkyRise Miami, the city's soon-to-be tallest tower is now under construction, ArchDaily reports.
Rising above Biscayne Bay, the 305-meter tower will include three viewing decks, a restaurant, nightclub, and exhibition space. Its most unique feature, however, will be the chance for visitors to bungee jump off of its upper floors.
Arquitectonica, who designed SkyRise, have said that they hope the tower will meet LEED Gold Standards when built. Construction is set to be completed in 2017.
Here is the Arquitectonica's design statement:
A continuous sheet of translucent mesh rises one thousand feet from the bay to the sky. It wraps around a colossal atrium and descends dramatically, forming a sweeping curve. At its base the curve becomes a monumental canopy under which cascading steps create a performance amphitheater. The resultant form can be interpreted as a giant wave, or a billfish jumping out of the water, a giant fishing net, or even a flowing dress over a sensuous form. More simply, the curving silhouette references Miami’s tropicality.
Unlike other observation towers, Sky Rise Miami is asymmetrical. It is decidedly directional, facing the Caribbean and South America. It welcomes our visitors from the south into North America. It is our abstract version of the Statue of Liberty. A sculpture to view from afar, and also to explore within.
Also, unlike other observation towers, Sky Rise Miami is more than a viewing deck. It has content. A cluster of functional levels at its top contain multiple restaurants, shops, an event ballroom, an exhibit gallery, a soaring domed theatre, a night club, and a thrill ride that allows daring visitors to drop at high speed from the sky to the bay along its facade. It emphasizes current thinking that architecture is not only about form, but also about content.
Related Stories
| Jan 3, 2012
Gensler: 'The One Firm Firm'
The giant architecture firm succeeds by giving each of its more than 3,000 employees the opportunity for career growth and professional leadership.
| Jan 3, 2012
Rental Renaissance, The Rebirth of the Apartment Market
Across much of the U.S., apartment rents are rising, vacancy rates are falling. In just about every major urban area, new multifamily rental projects and major renovations are coming online. It may be too soon to pronounce the rental market fully recovered, but the trend is promising.
| Dec 29, 2011
OSHA enforcing new fall hazard standards
OSHA is enforcing its new fall protection standards, as evidenced by a recent crackdown in New York.
| Dec 29, 2011
Decision not to fireproof the new World Trade Center Transportation Hub criticized
Some criticized the decision, reasoning that the structure could be a terrorist target.
| Dec 29, 2011
Seismic safety in question at thousands of California public schools
California regulators responsible for enforcing earthquake safety laws have failed to certify more than 16,000 construction projects in California public schools, increasing the risk that some projects may be unsafe, according to a state audit report.
| Dec 29, 2011
GreenWizard offers cloud-based LEED credit management, assessment
The company recently began offering companies the ability to run assessments for design credits, in addition to traditional product-specific LEED credits.
| Dec 27, 2011
Clayco awarded expansion of Washington University Data Center in St. Louis
Once completed, the new building addition will double the size of the data center which houses sophisticated computer networks that store massive amounts of genomic data used to identify the genetic origins of cancer and other diseases.
| Dec 27, 2011
Ground broken for adaptive reuse project
Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.
| Dec 27, 2011
Nova completes $60M Clearwater Conference Center
Comprising an entire city block, the 450,000 sq. ft. facility features over 400 meeting rooms, six theaters, a full-service health spa, complete with an indoor running track, and a commercial kitchen that can efficiently accommodate over 1,000 diners
| Dec 27, 2011
BD+C's Under 40 Leadership Summit update
The two-day Under 40 Leadership Summit continued with a Leadership Style interactive presentation; Great Solutions presentations from Under 40 attendees; the Owner’s Perspective panel discussion; and the Blue Ocean Strategy presentation.