flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Arquitectonica's hairpin-shaped tower breaks ground in Miami

Arquitectonica's hairpin-shaped tower breaks ground in Miami

Rising above Biscayne Bay, the 305-meter tower will include three viewing decks, a restaurant, nightclub, and exhibition space.


By BD+C Staff  | September 17, 2014

SkyRise Miami, the city's soon-to-be tallest tower is now under construction, ArchDaily reports.

Rising above Biscayne Bay, the 305-meter tower will include three viewing decks, a restaurant, nightclub, and exhibition space. Its most unique feature, however, will be the chance for visitors to bungee jump off of its upper floors. 

Arquitectonica, who designed SkyRise, have said that they hope the tower will meet LEED Gold Standards when built. Construction is set to be completed in 2017. 

Here is the Arquitectonica's design statement:
A continuous sheet of translucent mesh rises one thousand feet from the bay to the sky. It wraps around a colossal atrium and descends dramatically, forming a sweeping curve. At its base the curve becomes a monumental canopy under which cascading steps create a performance amphitheater. The resultant form can be interpreted as a giant wave, or a billfish jumping out of the water, a giant fishing net, or even a flowing dress over a sensuous form. More simply, the curving silhouette references Miami’s tropicality.

Unlike other observation towers, Sky Rise Miami is asymmetrical. It is decidedly directional, facing the Caribbean and South America. It welcomes our visitors from the south into North America. It is our abstract version of the Statue of Liberty. A sculpture to view from afar, and also to explore within.

Also, unlike other observation towers, Sky Rise Miami is more than a viewing deck. It has content. A cluster of functional levels at its top contain multiple restaurants, shops, an event ballroom, an exhibit gallery, a soaring domed theatre, a night club, and a thrill ride that allows daring visitors to drop at high speed from the sky to the bay along its facade. It emphasizes current thinking that architecture is not only about form, but also about content.

 

Related Stories

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021