flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Army Corps of Engineers moves into new engineering and support center

Government Buildings

Army Corps of Engineers moves into new engineering and support center

The building, in Huntsville, Ala., combines office and warehouse spaces.


By John Caulfield, Senior Editor | January 29, 2024
Redstone Gateway 300 building training room
A training room is one of the spaces inside the new Huntsville Center in Alabama. The new Redstone Gateway 300 building will allow the Army Corps of Engineers to consolidate its workforce in the state. Images: Courtesy of Robins & Morton

Earlier this month, the U.S. Army Engineering and Support Center, on Redstone Arsenal in Huntsville, Ala., opened, enabling the Army Corps of Engineers’ Huntsville Center to consolidate its workforce into one building.

The three-story Redstone Gateway 300 building, which broke ground on Nov. 5, 2021, features 200,000 sf of Class A office space and 15,000 sf of warehouse space that was constructed with concrete tilt-up wall panels. The facility combines private and open office areas, collaborative spaces, a large training room, a dining area, and fitness center, and conference room for the Corps’ commander.

The project represents the fifth multi-story tilt-wall building constructed by Robins & Morton in the office park since 2020. The project is pursuing LEED certification. Robins & Morton, which is based in Birmingham, Ala, was the general contractor, and Nola| Van Peursem Architects, also Alabama-based, was the project architect. COPT Defense Properties was the developer. Last November, Sentar Inc., a woman-owned small business specializing in advanced cyber-intelligence solutions and technology, was awarded a contract for the Center’s PAX Functional Services and Support in such areas as customer training and quality assurance.

Huntsville Center focuses on construction management

 

Conference room in Redstone Gateway 300 building
The Commander's conference room inside the Redstone Gateway 300 building.

The 468-acre Redstone Gateway, with more than 2.3 million sf of mixed-use space either built or under construction, is a joint venture development between COPT Defense Properties and Jim Wilson & Associates. The construction cost for the new Huntsville Center was not disclosed.

Huntsville Center’s origins date back to 1967, as Huntsville Division, whose first offices were in a converted textile mill. The Division has relocated several times since, the latest being into a facility at Thornton Research park in 2018.

The building's lobby
The lobby inside the Redstone Gateway 300 building.

 

The new building allows the Center to consolidate its off-post  leases, the Center’s workforce, and provides a more secure environment for the Center’s staff.

According to the Corps’ website, the Huntsville Center’s mission and functions are centered on four key processes: program and project management, engineering and technical services, construction management, and innovative contracting initiatives. The Corps executes more than 3,000 projects annually.

Related Stories

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Nov 8, 2013

Oversized healthcare: How did we get here and how do we right-size?

Healthcare facilities, especially our nation's hospitals, have steadily become larger over the past couple of decades. The growth has occurred despite stabilization, and in some markets, a decline in inpatient utilization.

| Nov 8, 2013

S+T buildings embrace 'no excuses' approach to green labs

Some science-design experts once believed high levels of sustainability would be possible only for low-intensity labs in temperate zones. But recent projects prove otherwise. 

| Nov 6, 2013

PECI tests New Buildings Institute’s plug load energy use metrics at HQ

Earlier this year, PECI used the NBI metrics to assess plug load energy use at PECI headquarters in downtown Portland, Ore. The study, which informed an energy-saving campaign, resulted in an 18 percent kWh reduction of PECI’s plug load.

| Oct 30, 2013

15 stellar historic preservation, adaptive reuse, and renovation projects

The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.

| Oct 30, 2013

Why are companies forcing people back to the office?

For a while now companies have been advised that flexibility is a key component to a successful workplace strategy, with remote working being a big consideration. But some argue that we’ve moved the needle too far toward a “work anywhere” culture. 

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

| Oct 28, 2013

Urban growth doesn’t have to destroy nature—it can work with it

Our collective desire to live in cities has never been stronger. According to the World Health Organization, 60% of the world’s population will live in a city by 2030. As urban populations swell, what people demand from their cities is evolving.

| Oct 18, 2013

Researchers discover tension-fusing properties of metal

When a group of MIT researchers recently discovered that stress can cause metal alloy to fuse rather than break apart, they assumed it must be a mistake. It wasn't. The surprising finding could lead to self-healing materials that repair early damage before it has a chance to spread. 

| Oct 18, 2013

Sustainability expert: Smart building technology can have quick payback

Smart building technology investments typically pay for themselves within one or two years by delivering energy savings and maintenance efficiencies.

boombox1
boombox2
native1

More In Category



Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021