flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Arkansas Arts Center to undergo $142 million transformation into the Arkansas Museum of Fine Arts

Museums

Arkansas Arts Center to undergo $142 million transformation into the Arkansas Museum of Fine Arts

Studio Gang is designing the project.


By David Malone, Associate Editor | January 28, 2021

All renderings courtesy Studio Gang.

Located in Little Rock, the Arkansas Arts Center is currently undergoing a $142 million transformation to become the Arkansas Museum of Fine Arts. The new museum will include an increase in space of almost 50% and the addition of 13 acres of new grounds.

The signature feature of Studio Gang’s design is a new structure, dubbed the Blossom, that winds through the length of the museum. Defined outwardly by its pleated roof, the Blossom will become the core of the visitor experience, laying out a clear path for visitors, uniting the museum’s programmed spaces, and providing major new public features at either end: an expansive glass-enclosed gathering space overlooking the Downtown side, and a restaurant that spreads out into MacArthur Park. The pleated roof also allows for the collection of storm water, which will feed the park’s new gardens and native perennial meadows.

 

Arkansas Museum of Fine Arts exterior

 

The project joins the landscape experience with the museum and provides 2,200 linear feet of new paths and trails throughout 13 acres of MAcArthur Park. Inspiration for the landscape (designed by SCAPE Landscape Architecture) draws from Little Rock’s unique regional ecologies, including the banks of Fourche Creek, the bluffs of Emerald Park, and the agrarian landscapes of the Mississippi Delta. 

 

Arkansas Museum of Fine Arts gallery

 

SCAPE’s design preserves many of the parks existing mature trees and relies on sustainable, native plantings and incorporates more than 50 species of perennials, shrubs, native trees, and ornamental grasses. An additional 250 new trees will be planted, which will create a canopy throughout the park over time.

The Arkansas Museum of Fine Arts is slated for completion in spring 2022.

 

The Blossom at the Arkansas Museum of Fine Arts

 

Arkansas Museum of Fine Arts entrance from the South

Tags

Related Stories

| Mar 29, 2012

Construction completed on Las Vegas’ newest performing arts center

The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.

| Mar 5, 2012

Franklin Institute in Philadelphia selects Skanska to construct new pavilion

The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 9, 2011

Lincoln Center Pavilion wins national architecture and engineering award

The project team members include owner Lincoln Center for the Performing Arts, New York; design architect and interior designer of the restaurant, Diller Scofidio + Renfro, New York; executive architect, FXFOWLE, New York; and architect and interior designer of the film center, Rockwell Group, New York; structural engineer Arup (AISC Member), New York; and general contractor Turner Construction Company (AISC Member), New York. 

| Oct 12, 2011

BIM Clarification and Codification in a Louisiana Sports Museum

The Louisiana State Sports Hall of Fame celebrates the sporting past, but it took innovative 3D planning and coordination of the future to deliver its contemporary design.

| Oct 12, 2011

Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health

  Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Apr 13, 2011

Expanded Museum of the Moving Image provides a treat for the eyes

The expansion and renovation of the Museum of the Moving Image in the Astoria section of Queens, N.Y., involved a complete redesign of its first floor and the construction of a three-story 47,000-sf addition.

| Apr 12, 2011

Entrance pavilion adds subtle style to Natural History Museum of Los Angeles

A $13 million gift from the Otis Booth Foundation is funding a new entrance pavilion at the Natural History Museum of Los Angeles County. CO Architects, Los Angeles, is designing the frameless structure with an energy-efficient curtain wall, vertical suspension rods, and horizontal knife plates to make it as transparent as possible.

| Jan 21, 2011

Sustainable history center exhibits Fort Ticonderoga’s storied past

Fort Ticonderoga, in Ticonderoga, N.Y., along Lake Champlain, dates to 1755 and was the site of battles in the French and Indian War and the American Revolution. The new $20.8 million, 15,000-sf Deborah Clarke Mars Education Center pays homage to the French magasin du Roi (the King’s warehouse) at the fort.

boombox1
boombox2
native1

More In Category

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021