flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Arkansas Arts Center to undergo $142 million transformation into the Arkansas Museum of Fine Arts

Museums

Arkansas Arts Center to undergo $142 million transformation into the Arkansas Museum of Fine Arts

Studio Gang is designing the project.


By David Malone, Associate Editor | January 28, 2021

All renderings courtesy Studio Gang.

Located in Little Rock, the Arkansas Arts Center is currently undergoing a $142 million transformation to become the Arkansas Museum of Fine Arts. The new museum will include an increase in space of almost 50% and the addition of 13 acres of new grounds.

The signature feature of Studio Gang’s design is a new structure, dubbed the Blossom, that winds through the length of the museum. Defined outwardly by its pleated roof, the Blossom will become the core of the visitor experience, laying out a clear path for visitors, uniting the museum’s programmed spaces, and providing major new public features at either end: an expansive glass-enclosed gathering space overlooking the Downtown side, and a restaurant that spreads out into MacArthur Park. The pleated roof also allows for the collection of storm water, which will feed the park’s new gardens and native perennial meadows.

 

Arkansas Museum of Fine Arts exterior

 

The project joins the landscape experience with the museum and provides 2,200 linear feet of new paths and trails throughout 13 acres of MAcArthur Park. Inspiration for the landscape (designed by SCAPE Landscape Architecture) draws from Little Rock’s unique regional ecologies, including the banks of Fourche Creek, the bluffs of Emerald Park, and the agrarian landscapes of the Mississippi Delta. 

 

Arkansas Museum of Fine Arts gallery

 

SCAPE’s design preserves many of the parks existing mature trees and relies on sustainable, native plantings and incorporates more than 50 species of perennials, shrubs, native trees, and ornamental grasses. An additional 250 new trees will be planted, which will create a canopy throughout the park over time.

The Arkansas Museum of Fine Arts is slated for completion in spring 2022.

 

The Blossom at the Arkansas Museum of Fine Arts

 

Arkansas Museum of Fine Arts entrance from the South

Tags

Related Stories

| Dec 19, 2013

Mastering the art of crowd control and visitor flow in interpretive facilities

To say that visitor facility planning and design is challenging is an understatement. There are many factors that determine the success of a facility. Unfortunately, visitor flow, the way people move and how the facility accommodates those movements, isn’t always specifically considered.

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Nov 27, 2013

BIG's 'oil and vinegar' design wins competition for the Museum of the Human Body [slideshow]

The winning submission by Bjarke Ingels Group (BIG) and A+ Architecture mixes urban pavement and parkland in a flowing, organic plan, like oil and vinegar, explains Bjarke Ingels. 

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

| Nov 19, 2013

Top 10 green building products for 2014

Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list. 

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Nov 13, 2013

First look: Renzo Piano's addition to Louis Kahn's Kimbell Art Museum [slideshow]

The $135 million, 101,130-sf colonnaded pavilion by the famed architect opens later this month. 

boombox1
boombox2
native1

More In Category

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021