flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Argentina reveals plans for Latin America’s tallest structure

Argentina reveals plans for Latin America’s tallest structure

The 1,165-foot-tall mixed-use tower will primarily serve the country's film and audiovisual industries.


By BD+C Staff | September 15, 2014

According to Archdaily, Argentine President Cristina Fernández de Kirchner has announced the winning proposal for the Cinematography and Audiovisual Tower, slated to be built in Buenos Aires, the country’s capital.

The winning design belongs to MRA+A Álvarez | Bernabó | Sabatini, which beat the four other proposals submitted for competition. The tower is planned to be 1,165 feet tall, surpassing the 985-foot Costanera tower in Santiago, Chile, and the 1,083-foot tower under construction in Monterrey, Mexico, thus making it the tallest building in Latin America upon completion.

“The edifice’s structure represents the Republic of Argentina,” President Kirchner told Argentine newspaper La Nación. “The river port entry will be the Tierra del Fuego and the arena will be our Malvinas Islands [sic] placed precisely on the Rio de la Plata.”

La Nación reports that the developer, Riva S.A., together with the central government, is investing more than 2,5 billion pesos for this project on the Demarchi Island in Buenos Aires. The tower will primarily host production space for the film industry as well as TV studios, but the top 13 floors will host a hotel. Museums are also planned to inhabit part of the 2,325,000 square meter development.

For more information, visit Archdaily for English, or La Nación for Spanish.

 

Related Stories

Multifamily Housing | Oct 5, 2022

Co-living spaces, wellness-minded designs among innovations in multifamily housing

The booming multifamily sector shows no signs of a significant slowdown heading into 2023. Here is a round up of Giants 400 firms that are driving innovation in this sector.

Contractors | Oct 5, 2022

Materials shortages, cost spikes throwing Design-Bid-Build process out of whack

The traditional Design-Bid-Build delivery process is under considerable stress this year as materials shortages and cost spikes are upending usual practices, according to a new report from JLL.

Green | Oct 5, 2022

In California, a public power provider’s new headquarters serves as a test case for an innovative microgrid and for reducing greenhouse gas emissions

Sonoma Clean Power (SCP), the public power provider for California’s Sonoma and Mendocino Counties, recently unveiled its new all-electric headquarters.

Contractors | Oct 4, 2022

Which comes first, the building or the cost estimate?

At the start of a project, don’t forget to establish financial parameters when you’re discussing the design and program. By establishing the costs up front, you can avoid the pitfalls that might derail your project and guarantee its lasting success.

Fire and Life Safety | Oct 4, 2022

Fire safety considerations for cantilevered buildings

Bold cantilevered designs are prevalent today, as developers and architects strive to maximize space, views, and natural light in buildings. Cantilevered structures, however, present a host of challenges for building teams, according to José R. Rivera, PE, Associate Principal and Director of Plumbing and Fire Protection with Lilker.

| Oct 4, 2022

Rental property owners want access to utility usage data for whole properties

As pressure from investors for ESG reporting mounts, owners of multifamily properties increasingly look to collect whole-building utility usage data.

| Oct 4, 2022

In dire need of affordable housing, Aspen, Colo. will get a development that provides 277 affordable homes

A few miles from downtown Aspen, Colo., a development will provide 277 new affordable homes for an area experiencing a dire affordable housing crisis.

Green | Oct 3, 2022

California regulators move to ban gas heaters for existing buildings

California regulators voted unanimously recently on a series of measures that include a ban on the sale of natural gas-powered heating and hot water systems beginning in 2030.

| Oct 3, 2022

The College of the Holy Cross completes a $110 million performing arts center

In Worcester, Mass., a one-hour drive from Boston, the College of the Holy Cross has completed its $110 million Prior Performing Arts Center.

Resiliency | Sep 30, 2022

Designing buildings for wildfire defensibility

Wold Architects and Engineers' Senior Planner Ryan Downs, AIA, talks about how to make structures and communities more fire-resistant.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021