According to Archdaily, Argentine President Cristina Fernández de Kirchner has announced the winning proposal for the Cinematography and Audiovisual Tower, slated to be built in Buenos Aires, the country’s capital.
The winning design belongs to MRA+A Álvarez | Bernabó | Sabatini, which beat the four other proposals submitted for competition. The tower is planned to be 1,165 feet tall, surpassing the 985-foot Costanera tower in Santiago, Chile, and the 1,083-foot tower under construction in Monterrey, Mexico, thus making it the tallest building in Latin America upon completion.
“The edifice’s structure represents the Republic of Argentina,” President Kirchner told Argentine newspaper La Nación. “The river port entry will be the Tierra del Fuego and the arena will be our Malvinas Islands [sic] placed precisely on the Rio de la Plata.”
La Nación reports that the developer, Riva S.A., together with the central government, is investing more than 2,5 billion pesos for this project on the Demarchi Island in Buenos Aires. The tower will primarily host production space for the film industry as well as TV studios, but the top 13 floors will host a hotel. Museums are also planned to inhabit part of the 2,325,000 square meter development.
For more information, visit Archdaily for English, or La Nación for Spanish.
Related Stories
| Nov 16, 2011
CRSI recommends return to inch-pound markings
The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014.
| Nov 16, 2011
John Patelski joins Ghafari as executive vice president
As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.
| Nov 15, 2011
Struggling economy demands construction industry embrace enterprise-wide risk management
In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 15, 2011
Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa
Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.
| Nov 14, 2011
Summit Design+Build selected at GC for new Office Concepts headquarters
The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout.
| Nov 14, 2011
Griffin Electric completes electrical work at Cary Arts Center
The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.