According to Archdaily, Argentine President Cristina Fernández de Kirchner has announced the winning proposal for the Cinematography and Audiovisual Tower, slated to be built in Buenos Aires, the country’s capital.
The winning design belongs to MRA+A Álvarez | Bernabó | Sabatini, which beat the four other proposals submitted for competition. The tower is planned to be 1,165 feet tall, surpassing the 985-foot Costanera tower in Santiago, Chile, and the 1,083-foot tower under construction in Monterrey, Mexico, thus making it the tallest building in Latin America upon completion.
“The edifice’s structure represents the Republic of Argentina,” President Kirchner told Argentine newspaper La Nación. “The river port entry will be the Tierra del Fuego and the arena will be our Malvinas Islands [sic] placed precisely on the Rio de la Plata.”
La Nación reports that the developer, Riva S.A., together with the central government, is investing more than 2,5 billion pesos for this project on the Demarchi Island in Buenos Aires. The tower will primarily host production space for the film industry as well as TV studios, but the top 13 floors will host a hotel. Museums are also planned to inhabit part of the 2,325,000 square meter development.
For more information, visit Archdaily for English, or La Nación for Spanish.
Related Stories
| May 31, 2012
New School’s University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.