flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Are energy management systems too complex for school facility staffs?

K-12 Schools

Are energy management systems too complex for school facility staffs?

When school districts demand the latest and greatest, they need to think about how those choices will impact the district’s facilities employees.


By John Caulfield, Senior Editor | March 1, 2015
Are energy management systems too complex for school facility staffs?

Photo courtesy EnergyManagementSystems.org

This article first appeared in the March 2015 issue of BD+C.

Jim Wilson thinks that, in their haste to make their schools modern and efficient, some school districts are installing energy management systems that are overtaxing the ability of their maintenance staffs.

Wilson owns JFW Inc., a 25-year-old project management company in Gaithersburg, Md. Most of the K-12 work he does is with private schools like Sidwell Friends, the Quaker school that President Obama’s daughters attend. Wilson says that Sidwell’s middle school has 3,000 contact points that have to be monitored, which puts a significant burden on the facility’s maintenance staff.

He says energy codes keep raising the complexity level of what’s being installed. Maintenance crews are having trouble keeping up with EMS technology that has jumped by leaps and bounds over the past 10 years. “We didn’t have all of these [air exchange] requirements that we do now,” he says.

Wilson recounts one school’s head of maintenance who was so flummoxed by the facility’s systems that he operated the building as if it were occupied 24/7 so he didn’t have to deal with the controls. “I got a call from the school asking why its electric bills were running sky high,” says Wilson.

Jim Deluge, a Project Executive with Turner Construction, believes that maintenance staffs have a responsibility to “catch up” to the sophistication level of these new EMS systems. On the flip side, HMC Architects’ Sandy Kate thinks problems could be reduced if maintenance staff were included in early planning meetings before construction begins.

School district officials who recognize this potential problem but still want state-of-the-art operating systems will sometimes outsource the monitoring. DRL Group’s Jim French says his firm’s engineers have the ability to remotely monitor a client’s systems and let that school know almost immediately if anything’s askew.

“You have to be careful not to get too exotic,” says Fanning Howey’s Chuck Tyler. The design firm recently worked with a school district in Belleville, Mich., that demanded the systems for a 320,000-sf high school be simple enough for the district’s current maintenance personnel to manage.

Wilson contends that some schools simply don’t need the high-octane systems they specify. One project he worked on called for a $180,000 EMS. What ultimately got installed, he says, was a $40,000 system “that can do pretty much what’s needed in the building” and matches the skill set of the maintenance team. 

When school districts demand the latest and greatest, they need to think about how those choices will impact the district’s facilities employees. On one recent project in Connecticut, Wilson had the contractor conduct six months of training sessions for the maintenance staff. “You can’t learn this stuff in two days of classes.”

Related Stories

Performing Arts Centers | Sep 11, 2017

19th century smokestack highlights a Massachusetts performing arts facility

CBT Architects and Windover Construction collaborated on the adaptive reuse project for Middlesex School.

K-12 Schools | Sep 8, 2017

The economic case for engaged classrooms in K-12 schools

Flexible, modern classrooms should be viewed as a key element of a sound financial strategy, producing a solid return-on-investment.

K-12 Schools | Aug 31, 2017

Environmental studies building highlights sustainability in every design element

The LEED Platinum and Zero Net Energy Verified building minimizes energy use via its site orientation.

K-12 Schools | Aug 18, 2017

How to create healthy learning environments with active design

Active design can be incorporated into any facility or campus with a few simple steps.

K-12 Schools | Aug 9, 2017

A school in Denmark is clad in 12,000 solar panels

C.F. Møller designed the building to create a connection between the school premises and the surrounding public urban space.

K-12 Schools | Aug 1, 2017

This new high school is the first to be built on a tech company’s campus

Design Tech High School, located on Oracle Corporation’s Headquarters campus, will span 64,000 sf across two stories and have a capacity of 550 students.

Education Facilities | Jul 14, 2017

Youth education center in Baltimore gets first students

Students learn environmental skills, natural resource management, urban agriculture, and water quality monitoring.

Great Solutions | Jul 12, 2017

The writing on the wall: Maker spaces encourage students to take an active role

Maker spaces, dry-erase walls, and flexible furniture highlight Kinkaid’s new Learning Center.

Building Team Awards | Jun 7, 2017

Rebuilding to heal: Sandy Hook Elementary School

Gold Award: Community involvement was paramount as Newtown, Conn., replaced the school where a mass shooting occurred.

K-12 Schools | Jun 5, 2017

PK-8 school will be Denver’s first CHPS-certified building

A “learning stair” will connect the cafeteria to the main level.

boombox1
boombox2
native1

More In Category




K-12 Schools

Inclusive design strategies to transform learning spaces

Students with disabilities and those experiencing mental health and behavioral conditions represent a group of the most vulnerable students at risk for failing to connect educationally and socially. Educators and school districts are struggling to accommodate all of these nuanced and, at times, overlapping conditions.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021