Global architecture firm Perkins & Will says it will issue its clients a “carbon forecast” for their projects.
This tool is an effort to “facilitate measurable and meaningful carbon reduction in the built environment,” according to a news release. Carbon forecasts will help clients understand their projects’ carbon emissions, and the impact of those emissions on human and environmental health, at the earliest stages of design.
The forecasts will include information on building design, construction, and operation (known as whole-life-carbon). And, importantly, they will identify steps clients and project teams can take to reduce those emissions.
The forecasts will include options on how to reduce operational carbon through passive design, minimization of energy loads, optimization of systems, disconnection from unclean fuel sources, and integration of renewable energy. Measures for realizing maximum reductions in embodied carbon will be offered.
In addition, the firm will provide opportunities for enabling circular design that can minimize material waste, maximize material reuse, and optimize environments for material health.
Related Stories
| Aug 11, 2010
Architecture billings index takes turn for the worse
After showing signs of stabilization over the last three months, the Architecture Billings Index (ABI) plunged nearly five points in June. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. The American Institute of Architects (AIA) reported the June ABI rating was 37.7, far lower than the 42.9 the previous month.
| Aug 11, 2010
Batson-Cook completes National Infantry Museum
Batson-Cook Company recently completed the $91 million National Infantry Museum in Columbus, Georgia. Working with the owner, the National Infantry Foundation, the general contractor has used this new structure to illuminate the honor, dedication and history of this unique fighting division of the United States Army.
| Aug 11, 2010
10% of world's skyscraper construction on hold
Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.
| Aug 11, 2010
Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report
A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants