flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Architecture Billings Index shows slight improvement

Architecture Billings Index shows slight improvement

This score reflects an increase in design services 


By AIA | March 19, 2014

After starting out the year on a positive note, there was another minor increase in the Architecture Billings Index (ABI) last month.

As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lead time between architecture billings and construction spending. The American Institute of Architects (AIA) reported that the February ABI score was 50.7, up slightly from a mark of 50.4 in January.

This score reflects an increase in design services (any score above 50 indicates an increase in billings). The new projects inquiry index was 56.8, down from the reading of 58.5 the previous month.

“The unusually severe weather conditions in many parts of the country have obviously held back both design and construction activity,” said AIA Chief Economist Kermit Baker, Hon. AIA, PhD. “The March and April readings will likely be a better indication of the underlying health of the design and construction markets. We are hearing reports of projects that had been previously shelved for extended periods of time coming back online as the economy improves.”

Key February ABI highlights:
- Regional averages: South (52.8),West (50.5), Northeast (48.3), Midwest (47.6)
- Sector index breakdown: multi-family residential (52.5), commercial / industrial (51.9), institutional (49.6), mixed practice (46.6)
- Project inquiries index: 56.8

The regional and sector categories are calculated as a 3-month moving average, whereas the national index and inquiries are monthly numbers.

Tags

Related Stories

| Mar 27, 2012

Precast concrete used for affordable, sustainable housing in New York

Largest affordable housing development in the nation will provide housing for close to 500,000 people. 

| Mar 27, 2012

Groundbreaking held for Valencia College West Campus Building 10 in Orlando

Project led by design-build team of SchenkelShultz Architecture and McCree General Contractors, both of Orlando.

| Mar 27, 2012

Hollister Construction completes LEED Silver bank in Woodland Park, N.J.

Ground-up construction project included installation of solar panels.

| Mar 26, 2012

Jones Lang LaSalle completes construction of $536M Parkview Regional Medical Center

Hospital ushers in new era of local access to advanced medical treatments in Northeast Indiana.

| Mar 26, 2012

McCarthy tops off Math and Science Building at San Diego Mesa College

Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.

| Mar 26, 2012

Los Angeles County to host free green building training

Opportunity for residential and commercial building professionals to gain insight on state and county green building standards and regulations.

| Mar 26, 2012

Ball State University completes nation's largest ground-source geothermal system

Ball State's geothermal system will replace four aging coal-fired boilers to provide renewable power that will heat and cool 47 university buildings, representing 5.5-million-sf on the 660-acre campus.

| Mar 22, 2012

Hawaiian architecture firm chooses FRP trellis system over traditional materials

MGA Architecture plans to add five more trellis systems on the neighboring building. 

| Mar 22, 2012

Moline Public Library uses copper as an exterior building material

Architects incorporate decorative copper panels to create the look of a heavy plate copper shingle. 

| Mar 21, 2012

10 common data center surprises

Technologies and best practices provide path for better preparation.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021