After five months of positive readings, the Architecture Billings Index (ABI) has fallen into negative terrain. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending.
The American Institute of Architects (AIA) reported the April ABI score was 48.4, following a mark of 50.4 in March. This score reflects a decrease in demand for design services (any score above 50 indicates an increase in billings). The new projects inquiry index was 54.4, down from mark of 56.6 the previous month.
āConsidering the continued volatility in the overall economy, this decline in demand for design services isnāt terribly surprising,ā said AIA Chief Economist, Kermit Baker, PhD, Hon. AIA. āAlso, favorable conditions during the winter months may have accelerated design billings, producing a pause in projects that have moved ahead faster than expected.āĀ
Key April ABI highlights:
- Regional averages: Northeast (51.0), Midwest (50.1), South (49.0),Ā West (48.0)
- Sector index breakdown: commercial / industrial (53.8), multi-family residential (50.5), institutional (46.6), mixed practice (45.0)
- Project inquiries index: 54.4
The regional and sector categories are calculated as a three-month moving average, whereas the index and inquiries are monthly numbers. +
Related Stories
| May 29, 2012
Torrance Memorial Medical Centerās pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents. Ā
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants āShowcaseā site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbaneās Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nationās nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Markās Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.