After five months of positive readings, the Architecture Billings Index (ABI) has fallen into negative terrain. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending.
The American Institute of Architects (AIA) reported the April ABI score was 48.4, following a mark of 50.4 in March. This score reflects a decrease in demand for design services (any score above 50 indicates an increase in billings). The new projects inquiry index was 54.4, down from mark of 56.6 the previous month.
“Considering the continued volatility in the overall economy, this decline in demand for design services isn’t terribly surprising,” said AIA Chief Economist, Kermit Baker, PhD, Hon. AIA. “Also, favorable conditions during the winter months may have accelerated design billings, producing a pause in projects that have moved ahead faster than expected.”
Key April ABI highlights:
- Regional averages: Northeast (51.0), Midwest (50.1), South (49.0), West (48.0)
- Sector index breakdown: commercial / industrial (53.8), multi-family residential (50.5), institutional (46.6), mixed practice (45.0)
- Project inquiries index: 54.4
The regional and sector categories are calculated as a three-month moving average, whereas the index and inquiries are monthly numbers. +
Related Stories
| Aug 21, 2012
Hong Kong’s first LEED Platinum pre-certified building opens
Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.
| Aug 21, 2012
Stellar wins four ABC Excellence In Construction awards
ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.
| Aug 20, 2012
Protecting the artifacts at George H.W. Bush Presidential Library and Museum
Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.
| Aug 17, 2012
Ferreri joins PGAL as Principal
Ferreri will be responsible for business development, contract negotiation, project design through construction and staff management/mentoring.
| Aug 17, 2012
Centric Architecture and PLAD Studio merge
The new firm will retain Centric Architecture as its name.
| Aug 15, 2012
MBH Architects announces new appointments
MBH Architects continues to grow, take on new clients.
| Aug 15, 2012
Architects and designers challenged in Allsteel’s reality design competition
KITS mobile app offers flexibility in planning.
| Aug 14, 2012
Leo A Daly welcomes Carl Gentilcore
Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.
| Aug 14, 2012
SOM Foundation announces prize recipients for 2012
Submissions for the SOM Prize were received from students at 34 schools in the U.S.
| Aug 9, 2012
Slideshow: New renderings of 1 WTC
Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.