flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Architecture Billings Index reverts to negative territory

Architecture Billings Index reverts to negative territory

Decline is possibly a brief pause from unusually strong winter activity.


By Posted by Tim Gregorski, Senior Editor | May 16, 2012
This article first appeared in the June 2012 issue of BD+C.

After five months of positive readings, the Architecture Billings Index (ABI) has fallen into negative terrain. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending.

The American Institute of Architects (AIA) reported the April ABI score was 48.4, following a mark of 50.4 in March. This score reflects a decrease in demand for design services (any score above 50 indicates an increase in billings). The new projects inquiry index was 54.4, down from mark of 56.6 the previous month.

“Considering the continued volatility in the overall economy, this decline in demand for design services isn’t terribly surprising,” said AIA Chief Economist, Kermit Baker, PhD, Hon. AIA. “Also, favorable conditions during the winter months may have accelerated design billings, producing a pause in projects that have moved ahead faster than expected.” 

Key April ABI highlights:

  • Regional averages: Northeast (51.0), Midwest (50.1), South (49.0),  West (48.0)
  • Sector index breakdown: commercial / industrial (53.8), multi-family residential (50.5), institutional (46.6), mixed practice (45.0)
  • Project inquiries index: 54.4

The regional and sector categories are calculated as a three-month moving average, whereas the index and inquiries are monthly numbers. +

Related Stories

| Jul 9, 2014

Harvard Business School to build large-scale conference center

Expected to open in 2018, the facility will combine the elements of a large-scale conference center, a performance space, and an intimate community forum. The new building will be designed by Boston-based William Rawn and Associates.

| Jul 9, 2014

Top U.S. cities for design professionals

Though New York and Los Angeles are often seen as the sole hubs for design jobs, other design epicenters are scattered between the coasts.

| Jul 9, 2014

The one misstep that could be slowing your company’s growth

Change. It’s inevitable. And success for any professional may very well depend on how well we adapt to it. SPONSORED CONTENT

| Jul 9, 2014

First Look: SOM's design for All Aboard Florida Fort Lauderdale rail station

The lightweight and luminous design "responds to its setting and creates a striking infrastructural icon for the city," said SOM Design Partner Roger Duffy. 

| Jul 8, 2014

Fast-track naval hospital sparks sea change in project delivery [2014 Building Team Awards]

Through advanced coordination methods and an experimental contract method, the Building Team for Camp Pendleton’s new hospital campus sets a new standard for project delivery.

| Jul 8, 2014

Does Zaha Hadid’s Tokyo Olympic Stadium have a design flaw?

After being criticized for the cost and size of her stadium design for the 2020 Olympics in Tokyo, a Japanese architect points out a major design flaw in the stadium that may endanger the spectators.

| Jul 8, 2014

Frank Lloyd Wright's posthumous gas station opens in Buffalo

Eighty-seven years after Frank Lloyd Wright designed an ornamental gas station for the city of Buffalo, the structure has been built and opened to the public—inside an auto museum. 

| Jul 8, 2014

Lost in the Museum: Bjarke Ingels' maze will make you look up and around

The maze, located in the National Building Museum, is a precursor to an exhibit showcasing some of BIG's projects. To navigate the maze, people must look up.

| Jul 7, 2014

5 factors that can affect thermal stress break risk of insulated glass units

The glass type, glass coating, shading patterns, vents, and framing system can impact an IGU’s risk for a thermal break.

| Jul 7, 2014

Team unity pays off for a new hospital in Maine [2014 Building Team Awards]

Extensive use of local contractors, vendors, and laborers brings a Maine hospital project in months ahead of schedule.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021