flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Architecture Billings Index rebounds at end of 2014

Architecture Billings Index rebounds at end of 2014

Design contracts posted a mark of 49.9, after a 54.9 score in November.


By AIA | January 22, 2015

There were ten out of twelve months of increasing demand for design services in 2014, and the Architecture Billings Index (ABI) points to a healthy outlook for the nonresidential construction industry. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lead time between architecture billings and construction spending. The American Institute of Architects (AIA) reported the December ABI score was 52.2, up from a mark of 50.9 in November. This score reflects an increase in design activity (any score above 50 indicates an increase in billings). The new projects inquiry index was 58.2, following a mark of 58.8 the previous month. Design contracts posted a mark of 49.9, after a 54.9 score in November.

“Business conditions continue to be the strongest at architecture firms in the South and the Western regions,” said AIA Chief Economist Kermit Baker, Hon. AIA, PhD. “Particularly encouraging is the continued solid upturn in design activity at institutional firms, since public sector facilities were the last nonresidential building project type to recover from the downturn.”

 

Key December ABI highlights:

• Regional averages: South (56.8), West (52.9), Midwest (50.8), Northeast (45.5)

• Sector index breakdown: multi-family residential (55.7), institutional (52.5), commercial / industrial (51.2), mixed practice (45.8)

• Project inquiries index: 58.2

• Design contracts index: 49.9

The regional and sector categories are calculated as a 3-month moving average, whereas the national index, design contracts and inquiries are monthly numbers.

Tags

Related Stories

| Jul 18, 2012

Construction employment stagnates in June

Lack of hiring in construction combined with job growth elsewhere threatens to create skilled-labor gap once contractors are ready to hire again.

| Jul 18, 2012

Legat & Kingscott relocates architecture/interior design office

Move enables the architecture/interior design firm to better serve its expanding clientele.

| Jul 18, 2012

Alcoa appoints Hunter Architectural Manager

Hunter to operate with the goal of driving specification, new product adoption and overall demand for the Alcoa BCS North America product range.

| Jul 17, 2012

AIA and Architecture for Humanity select Disaster Response Grant recipients

Awards help each group implement their locally driven preparedness project in the second half of the year.  

| Jul 17, 2012

KM/Plaza changes name to Plaza Construction

Lands new projects including the Perry South Beach Hotel and Dadeland Mall Kendall Wing Expansion.

| Jul 17, 2012

Dr. Phillips Charities Headquarters Building receives LEED Silver

The building incorporates sustainable design features, environmentally-friendly building products, energy efficient systems, and environmentally sensitive construction practices.

| Jul 16, 2012

BD+C Under 40 Leadership Summit scheduled

Attendee registration for U40 Summit II now open.

| Jul 16, 2012

Construction spending at 2 ½ year peak

Construction economist Ken Simonson says that four private nonresidential categories each posted 12-month spending increases of more than 25%: power and energy construction, 35%; hotels, 29%; educational and manufacturing, 27% apiece.

| Jul 16, 2012

Chen named design director at Heery

Chen comes to Heery from his own firm, Mark Chen Architect, a design and planning consulting firm, based in New York City, whose recent work includes large-scale planning studies for mixed-use projects.

| Jul 16, 2012

Reed Construction hires new project manager

Fread is a LEED AP and received his degree from Purdue University.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021