flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Architects urge government to reform design-build contracting process

Architects urge government to reform design-build contracting process

Many design and architectural firms fear losing money when bidding on federal contracts, according to the AIA.


By AIA | December 3, 2013

Current federal contracting laws are discouraging talented architects from competing for federal contracts, depriving government and, by inference, taxpayers of the best design expertise available, according to AIA testimony presented today on Capitol Hill.

Testifying before the House of Representatives Committee on Oversight and Government Reform, Charles Dalluge, Executive Vice President of Omaha, Nebraska-based architecture firm Leo A Daly, called for reform of the design-build contracting process so that more design and architectural firms can bid on federal contracts without fear of losing money in the process.

The federal market has been a key for architecture firms’ survival in the recession, and increased competition costs have forced many firms from participating in federal contracts, Dalluge testified.

“According to a survey published by the AIA Large Firm Roundtable in 2012, between 2007 and 2011 architecture firms in teams that competed for public- and private-sector design-build projects spent a median of $260,000, by making detailed plans, models and other materials,” Dalluge said. In recent years, federal agencies have forced larger numbers of teams to compete against one another, reducing the chances that any one team can win. 

“Due to the current economic climate, design firms face the dilemma of ‘betting it all’ on a contract they may not get, or self-selecting out of the federal design-build market,” Dalluge said, adding that it also costs taxpayers more money “when contracting officers spend increasing amounts of time reviewing a larger number of complicated design proposals.”

To reform the burdensome federal contracting process, Dalluge called on Congress to pass The Design-Build Efficiency and Jobs Act of 2013 (H.R. 2750), which was introduced by Rep. Sam Graves (R-MO) in July.

“H.R. 2750 requires contracting officers to provide a written justification to the head of an agency for requiring more than five finalists in the second stage of a design-build solicitation and agency approval of such justification,” Dalluge said. “H.R. 2750 will provide more certainty and opportunities for design firms of all sizes who wish to enter the federal marketplace. It will ensure that agencies have the ability to select the most qualified design-build teams who will deliver the best buildings for agencies and the public. It also will limit federal agencies’ burdens in reviewing a large number of proposals.”

About the American Institute of Architects
For over 150 years, members of the American Institute of Architects have worked with each other and their communities to create more valuable, healthy, secure, and sustainable buildings and cityscapes. Members adhere to a code of ethics and professional conduct to ensure the highest standards in professional practice. Embracing their responsibility to serve society, AIA members engage civic and government leaders and the public in helping find needed solutions to pressing issues facing our communities, institutions, nation and world. Visit www.aia.org.

About LEO A DALY
Established in 1915, LEO A DALY is an international architecture, engineering, and interior design firm. The Company’s portfolio includes award-winning projects in 87 countries and all 50 states. With over 800 employees in 30 offices worldwide, the firm ranks in the top 10 largest design firms in the United States and top 25 globally. For more information, visit www.leoadaly.com

Related Stories

Office Buildings | Jun 15, 2023

An office building near DFW Airport is now home to two Alphabet companies

A five-minute drive from the Dallas-Fort Worth International Airport, the recently built 2999 Olympus is now home to two Alphabet companies: Verily, a life sciences business, and Wing, a drone delivery company. Verily and Wing occupy the top floor (32,000 sf and 4,000 sf, respectively) of the 10-story building, located in the lakeside, work-life-play development of Cypress Waters.

Transit Facilities | Jun 15, 2023

Arlington, Va., transit station will support zero emissions bus fleet

Arlington (Va.) Transit’s new operations and maintenance facility will support a transition of their current bus fleet to Zero Emissions Buses (ZEBs). The facility will reflect a modern industrial design with operational layouts to embrace a functional aesthetic. Intuitive entry points and wayfinding will include biophilic accents.

Urban Planning | Jun 15, 2023

Arizona limits housing projects in Phoenix area over groundwater supply concerns

Arizona will no longer grant certifications for new residential developments in Phoenix, it’s largest city, due to concerns over groundwater supply. The announcement indicates that the Phoenix area, currently the nation’s fastest-growing region in terms of population growth, will not be able to sustain its rapid growth because of limited freshwater resources. 

Multifamily Housing | Jun 15, 2023

Alliance of Pittsburgh building owners slashes carbon emissions by 45%

The Pittsburgh 2030 District, an alliance of property owners in the Pittsburgh area, says that it has reduced carbon emissions by 44.8% below baseline. Begun in 2012 under the guidance of the Green Building Alliance (GBA), the Pittsburgh 2030 District encompasses more than 86 million sf of space within 556 buildings. 

Industry Research | Jun 15, 2023

Exurbs and emerging suburbs having fastest population growth, says Cushman & Wakefield

Recently released county and metro-level population growth data by the U.S. Census Bureau shows that the fastest growing areas are found in exurbs and emerging suburbs. 

Healthcare Facilities | Jun 14, 2023

Design considerations for behavioral health patients

The surrounding environment plays a huge role in the mental state of the occupants of a space, especially behavioral health patients whose perception of safety can be heightened. When patients do not feel comfortable in a space, the relationships between patients and therapists are negatively affected.

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

University Buildings | Jun 14, 2023

Calif. State University’s new ‘library-plus’ building bridges upper and lower campuses

A three-story “library-plus” building at California State University, East Bay (CSUEB) that ties together the upper and lower campuses was recently completed. The 100,977-sf facility, known as the Collaborative Opportunities for Research & Engagement (“CORE”) Building, is one of the busiest libraries in the CSU system. The previous library served 1.2 million visitors annually.

Higher Education | Jun 14, 2023

Designing higher education facilities without knowing the end users

A team of architects with Page offers five important factors to consider when designing spaces for multiple—and potentially changing—stakeholders.

Resiliency | Jun 14, 2023

HUD offers $4.8 billion in funding for green and resilient building retrofit projects

The Department of Housing and Urban Development (HUD) recently released guidelines for its Green and Resilient Retrofit Program (GRRP) that has $4.8 billion for funding green projects.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021