flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Architects urge government to reform design-build contracting process

Architects urge government to reform design-build contracting process

Many design and architectural firms fear losing money when bidding on federal contracts, according to the AIA.


By AIA | December 3, 2013

Current federal contracting laws are discouraging talented architects from competing for federal contracts, depriving government and, by inference, taxpayers of the best design expertise available, according to AIA testimony presented today on Capitol Hill.

Testifying before the House of Representatives Committee on Oversight and Government Reform, Charles Dalluge, Executive Vice President of Omaha, Nebraska-based architecture firm Leo A Daly, called for reform of the design-build contracting process so that more design and architectural firms can bid on federal contracts without fear of losing money in the process.

The federal market has been a key for architecture firms’ survival in the recession, and increased competition costs have forced many firms from participating in federal contracts, Dalluge testified.

“According to a survey published by the AIA Large Firm Roundtable in 2012, between 2007 and 2011 architecture firms in teams that competed for public- and private-sector design-build projects spent a median of $260,000, by making detailed plans, models and other materials,” Dalluge said. In recent years, federal agencies have forced larger numbers of teams to compete against one another, reducing the chances that any one team can win. 

“Due to the current economic climate, design firms face the dilemma of ‘betting it all’ on a contract they may not get, or self-selecting out of the federal design-build market,” Dalluge said, adding that it also costs taxpayers more money “when contracting officers spend increasing amounts of time reviewing a larger number of complicated design proposals.”

To reform the burdensome federal contracting process, Dalluge called on Congress to pass The Design-Build Efficiency and Jobs Act of 2013 (H.R. 2750), which was introduced by Rep. Sam Graves (R-MO) in July.

“H.R. 2750 requires contracting officers to provide a written justification to the head of an agency for requiring more than five finalists in the second stage of a design-build solicitation and agency approval of such justification,” Dalluge said. “H.R. 2750 will provide more certainty and opportunities for design firms of all sizes who wish to enter the federal marketplace. It will ensure that agencies have the ability to select the most qualified design-build teams who will deliver the best buildings for agencies and the public. It also will limit federal agencies’ burdens in reviewing a large number of proposals.”

About the American Institute of Architects
For over 150 years, members of the American Institute of Architects have worked with each other and their communities to create more valuable, healthy, secure, and sustainable buildings and cityscapes. Members adhere to a code of ethics and professional conduct to ensure the highest standards in professional practice. Embracing their responsibility to serve society, AIA members engage civic and government leaders and the public in helping find needed solutions to pressing issues facing our communities, institutions, nation and world. Visit www.aia.org.

About LEO A DALY
Established in 1915, LEO A DALY is an international architecture, engineering, and interior design firm. The Company’s portfolio includes award-winning projects in 87 countries and all 50 states. With over 800 employees in 30 offices worldwide, the firm ranks in the top 10 largest design firms in the United States and top 25 globally. For more information, visit www.leoadaly.com

Related Stories

| Mar 1, 2012

Aragon Construction completes 67,000-sf build-out in NYC

Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.

| Mar 1, 2012

Bomel completes design-build parking complex at U.C. San Diego

The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level. 

| Mar 1, 2012

Eidco Construction bolsters Chicago office

Eldco hires Peterson and Vivoda as senior project managers.

| Mar 1, 2012

Reconstruction of L.A.’s Dunbar Hotel underway

Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.

| Feb 29, 2012

C.W. Driver opens new office, appoints Castillo regional SVP

Castillo will oversee projects with new and existing clients in northern California within the areas of education, healthcare/biomedical, public sector, military contracting, entertainment, retail, corporate and hospitality.

| Feb 29, 2012

Report says BIPV glass market to reach $6.4 billion by 2016

The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021