flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Architects and designers challenged in Allsteel’s reality design competition

Architects and designers challenged in Allsteel’s reality design competition

KITS mobile app offers flexibility in planning.


By Posted by Tim Gregorski, Senior Editor | August 15, 2012
The company is rolling out the Where Would You Gather competition, an opportun
The company is rolling out the Where Would You Gather competition, an opportunity to try out the new app.

Contract furniture manufacturer Allsteel Inc. recently launched the KITS Collaborator, a free augmented reality iPad application allowing users to develop furniture layouts for any environment. Concurrently, the company is rolling out the “Where Would You Gather” competition, an opportunity to try out the new app. The contest is open for entries until September 14.

The competition is simple. Participants download the app, take a photo of a location, and then use the app to design a one-of-a-kind place where they would like to gather, incorporating Allsteel’s collaborative furnishings. Entries uploaded to the contest website, www.wherewouldyougather.com, are eligible to win an all-inclusive Grand Prize trip for two to NeoCon 2013 in Chicago, custom Gather furnishings including a Linger chair and a Scooch ottoman, and American Express gift cards.

The KITS Mobile app is surprisingly powerful for something so user-friendly. It engages the iPad’s camera, creating to-scale onscreen environments from the device’s snapshots, which can then be furnished with a simple swipe of the user’s finger. It also allows users to move Allsteel furnishings around within the space, change materials, color combinations and finishes, and produce unlimited high-resolution photo-realistic renderings within seconds. A series of easily accessed functions and controls allows users to add, remove, duplicate, change or group products together; or they can toggle between photo view, 3D view, plan view or elevation view.  Selected furnishings are dragged and dropped into place, and the app uses a series of advanced algorithms to effectively determine the geometric ground plane, sizing each item appropriately as it is positioned in the environment. It’s a technological breakthrough that has been achieved without the need for a ‘marker’ traditionally required to accurately assess and calculate space dimensions.            

Seeking to make all of its digital tools more effective and intuitive, Allsteel has recently re-launched its website, www.AllsteelOffice.com, as well. Boasting pared-down navigation and optimized browsing and search tools, the highly interactive site allows visitors to explore Allsteel’s impressive product portfolio and utilize planning tools like CAD and Revit data to incorporate favorites into their designs. Like KITS, the new site was intended to streamline the selection and design process for customers, increasing productivity and profitability. For more information on Allsteel and its complete digital toolkit, visit www.Allsteeloffice.com. +

Related Stories

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| May 14, 2012

SMPS and Deltek announce alliance

A/E/C industry leaders partner to advance technology’s role in design firm marketing and business development.

| May 14, 2012

ArchiCAD e-Specs integration unveiled

Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.

| May 11, 2012

2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution

Download the complete White Paper, Chapters 1-10

| May 11, 2012

Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings

We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.

| May 11, 2012

Chapter 9 The Key to Commissioning That Works? It Never Stops

Why commissioning for existing and renovated buildings needs to be continuous to be effective.

| May 11, 2012

Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity

What historic preservationists and energy-performance advocates can learn from each other.

| May 11, 2012

VFA to acquire Altus Group's Capital Planning division

Strategic move strengthens VFA's facilities capital planning market osition in North America.

| May 11, 2012

Betz promoted to senior vice president for McCarthy’s San Diego Office

He will oversee client relations, estimating, office operations and personnel as well as integration of the company’s scheduling, safety and contracts departments.

| May 11, 2012

CRSI appoints Brace chairman

Stevens also elected to board of directors and vice-chair.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021