Architect of the Capitol J. Brett Blanton was fired by President Biden for alleged ethical violations and strong criticism by members of Congress from both sides of the aisle.
Blanton was responsible for upkeep and operation of over 18 million sf of buildings and 570 acres of land at the U.S. Capitol. An investigation conducted by the Architect of the Capitol Inspector General’s Office found Blanton had “abused his authority, misused government property and wasted taxpayer money, among other substantiated violations.”
Blanton was sharply criticized during a House Administration Committee hearing, where he told lawmakers that he wasn’t on the grounds during the Jan. 6 attack on the Capitol. Blanton said he was “directing personnel” from his government vehicle, which he said served as his office’s mobile command post during the riot.
Blanton said the inspector general’s report “is filled with errors, omissions, mischaracterizations, misstatements, and conclusionary statements lacking evidence."
Related Stories
| Dec 16, 2011
Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University
The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration.
| Dec 16, 2011
Stalco Construction converts Babylon, N.Y. Town Hall into history museum
The project converted the landmark structure listed on the National Register of Historic Places into the Town of Babylon History Museum at Old Town Hall.
| Dec 14, 2011
Belfer Research Building tops out in New York
Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.
| Dec 14, 2011
Tyler Junior College and Sika Sarnafil team up to save energy
Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time.
| Dec 13, 2011
Lutron’s Commercial Experience Center awarded LEED Gold
LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.
| Dec 12, 2011
AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year
SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment.
| Dec 12, 2011
Skanska to expand and renovate hospital in Georgia for $103 Million
The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.
| Dec 12, 2011
CRSI design awards deadline extended to December 31
The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.