Architect of the Capitol J. Brett Blanton was fired by President Biden for alleged ethical violations and strong criticism by members of Congress from both sides of the aisle.
Blanton was responsible for upkeep and operation of over 18 million sf of buildings and 570 acres of land at the U.S. Capitol. An investigation conducted by the Architect of the Capitol Inspector General’s Office found Blanton had “abused his authority, misused government property and wasted taxpayer money, among other substantiated violations.”
Blanton was sharply criticized during a House Administration Committee hearing, where he told lawmakers that he wasn’t on the grounds during the Jan. 6 attack on the Capitol. Blanton said he was “directing personnel” from his government vehicle, which he said served as his office’s mobile command post during the riot.
Blanton said the inspector general’s report “is filled with errors, omissions, mischaracterizations, misstatements, and conclusionary statements lacking evidence."
Related Stories
| Dec 21, 2011
Hoboken Terminal restoration complete
Restoration of ferry slips, expanded service to benefit commuters.
| Dec 21, 2011
BBI key to Philly high-rise renovation
The 200,000 sf building was recently outfitted with a new HVAC system and a state-of-the-art window retrofitting system.
| Dec 20, 2011
Gluckman Mayner Architects releases design for Syracuse law building
The design reflects an organizational clarity and professional sophistication that anticipates the user experience of students, faculty, and visitors alike.
| Dec 20, 2011
Research identifies most expensive U.S. commercial real estate markets
New York City, Washington, D.C. and San Mateo, Calif., rank highest in rents.
| Dec 20, 2011
Third annual Gingerbread Build-off winners announced
Nine awards were handed out acknowledging the most unique and creative gingerbread structures completed.
| Dec 20, 2011
BCA’s Best Practices in New Construction available online
This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.
| Dec 20, 2011
Aragon Construction leading build-out of foursquare office
The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.
| Dec 20, 2011
HOAR Construction opens Austin, Texas office
Major projects in central Texas spur firm’s growth.
| Dec 19, 2011
HGA renovates Rowing Center at Cornell University
Renovation provides state-of-the-art waterfront facility.
| Dec 19, 2011
Chicago’s Aqua Tower wins international design award
Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.