Architect of the Capitol J. Brett Blanton was fired by President Biden for alleged ethical violations and strong criticism by members of Congress from both sides of the aisle.
Blanton was responsible for upkeep and operation of over 18 million sf of buildings and 570 acres of land at the U.S. Capitol. An investigation conducted by the Architect of the Capitol Inspector General’s Office found Blanton had “abused his authority, misused government property and wasted taxpayer money, among other substantiated violations.”
Blanton was sharply criticized during a House Administration Committee hearing, where he told lawmakers that he wasn’t on the grounds during the Jan. 6 attack on the Capitol. Blanton said he was “directing personnel” from his government vehicle, which he said served as his office’s mobile command post during the riot.
Blanton said the inspector general’s report “is filled with errors, omissions, mischaracterizations, misstatements, and conclusionary statements lacking evidence."
Related Stories
| Mar 14, 2012
Plans for San Francisco's tallest building revamped
The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.
| Mar 14, 2012
Hyatt joins Thornton Tomasetti as VP in Chicago
A forensic specialist, Hyatt has more than 10 years of experience performing investigations of structural failures throughout the U.S.
| Mar 14, 2012
Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.
Building will house research into personalized, gene-based cancer screening and treatment.
| Mar 13, 2012
China's high-speed building boom
A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.
| Mar 13, 2012
Commercial glazer Harmon expanding into Texas
Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.
| Mar 13, 2012
Worker office space to drop below 100-sf in five years
The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.
| Mar 12, 2012
Improving the performance of existing commercial buildings: the chemistry of sustainable construction
Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.
| Mar 9, 2012
2012 Giants 300 survey due Friday, April 13
See how your firm ranks among the AEC industry leaders.