flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Arcadia (Calif.) High School opens $20 million performing arts center

Arcadia (Calif.) High School opens $20 million performing arts center

McCarthy Building Companies and LPA Inc. were among the Building Team members on the new center


By McCarthy Building Companies | February 6, 2013
Arcadia (Calif.) High School opens $20 million performing arts center
Arcadia (Calif.) High School opens $20 million performing arts center

A 60-year old wish for the community of Arcadia has finally come true with the opening of Arcadia Unified School District’s new $20 million Performing Arts Center. It was the District’s intent to build an auditorium in 1952 when the high school was originally constructed, but there was no funding.  Due to the passage of Bond Measure I in 2006, the District finally had a chance to fulfill this community’s enduring dream.

"We are exceptionally pleased to have realized the dream of providing our students, faculty and community members with a world class performing arts venue that will become a home for the arts in Arcadia,” said AUSD Superintendent Dr. Joel Shawn. “All aspects of the arts are an essential component of a rigorous education for our students and a healthy, vibrant community."

McCarthy Building Companies, Inc., one of Southern California’s foremost building companies specializing in educational facilities, served as general contractor/developer for the facility using Lease/Leaseback project delivery. Constructed on a 4.2 acre site at the northwest end of the Arcadia High School campus, the 40,000 square-foot theater venue opened on October 27, 2012 with an inaugural benefit concert by living music legend Paul Anka.

In addition to being used by the high school for drama, dance and music performances and classes, the new Center will be enjoyed by the entire community, as it is the only performing arts venue in the City of Arcadia.  The nonprofit Arcadia Performing Arts Foundation was recently created to support the new center with efforts underway to fund the maintenance and a full-time theater manager for the Center.

Designed by LPA, Inc. the new Performing Arts Center is the latest addition to Arcadia High School’s historic campus. Performing arts, especially music, are extremely important to the Arcadia Unified School District, and this high-concept facility showcases this priority for the Arts through its architecture.

The main performance hall incorporates ground level and mezzanine seating for 1,200 and a stage with capacity for up to 200 musicians. Designed for acoustic performance, this space is equipped with adjustable sound-absorptive panels that allow it to be acoustically “tuned” based on the needs of the performance. In addition, moveable orchestra shells can be utilized to adjust the size of the stage to the performance and the orchestra shell’s acoustical qualities increase the sound projection to the audience.   The main hall is also designed with professional lighting and sound systems as well as other state-of-the-art technology making it an exciting venue for the visual arts.

Students can access the main hall from three adjacent classrooms in the Center. Each classroom space has been tailored to instructors’ and students’ needs including a large sound attenuated orchestra room with sound proof practice rooms, instrument storage and a library; a Blackbox/Drama Room with a separate control room and flexible seating for 125 guests; and a Dance Room with a quadruple-sprung wood floor, dressing rooms and a full service backstage facility for scene prop and costumes storage as well as professional stage craft areas. The facility also incorporates a dramatic internal courtyard, lobby and outdoor pavilion areas.

Built with a sloping concrete floor, the steel frame structure features a modern glass, smooth plaster and brick exterior. Interior finishes include cabinetry for music instrument storage, and multiple flooring types such as wood, ceramic tile, carpet, terrazzo and concrete.

Special construction techniques were used to meet the facility’s acoustical and architectural requirements. “A gypsum plaster finish was applied in the theater in lieu of the conventional drywall to increase the density of the walls, along with coffered ceilings in order to provide enhanced acoustical properties within the space,” said McCarthy Project Manager Michael Forys.  “We also constructed a 10,000-square-foot scaffold platform to build the 40-foot high ceilings in the main theater.”

Forys noted that the smooth exterior plaster finish provided a unique challenge on the project. “If not finished properly, the exterior walls could look uneven or wavy. To mitigate this challenge, McCarthy spent considerable time with the installing subcontractor reviewing specs, construction details and installation methods prior to the start of the plaster construction to assure that the team would be able to achieve the desired effect in a consistent manner. The proactive quality control for this scope of work helped produce a beautiful end-product exceeding all expectations.”

Forys said that another quality focus of the team was the potential for latent moisture in the concrete slabs that could ultimately effect floor covering adhesion. “Due to recent low VOC legislation changes in the flooring industry, McCarthy has developed a comprehensive flooring coordination program that is utilized to avoid floor issues. In this facility, the program was implemented early in the project and measures were put in place from the foundation on up to reduce concrete slab vapor transmission and maintain the integrity of the finished product,” explained Forys.

“By utilizing Lease/Leaseback procurement of the project, we were able to more effectively work through project challenges during the preconstruction phase that we normally encounter during construction.  This alternative delivery also helped to maintain the project budget and provide cost certainty for the District. This was accomplished by conducting a thorough constructability review of the plans while working with the District and design team during preconstruction to create an accurate budget.  Also, a lot of time, not normally afforded on hard-bid projects, was spent reviewing the plans and scopes of work with the subcontracting community.  This allowed us to provide precise estimates and avoid scope gaps.”

“Delivering high-level of quality was a major priority for this project,” said Forys. “The numerous finish elements (brick, composite aluminum, cement plaster, gypsum plaster, etc.) and their interfaces were all seamlessly integrated.  The completed product is a beautiful facility that McCarthy and the District are very proud of and that everyone in the community can enjoy.”

McCarthy is currently overseeing construction projects at 10 elementary and middle schools within the Arcadia Unified School District school facility improvement program including new buildings and modernization.

About McCarthy
Recognized as one of the nation’s few true builders, McCarthy Building Companies, Inc. is the largest educational facilities builder in California (ENR California, July 2012) and the largest general building contractor in California (ENR California, July 2012).  The company is committed to the construction of high performance green buildings; progressive job site technology; and safer, faster and more cost-effective execution. In addition to Newport Beach, McCarthy has offices in San Diego, Sacramento and San Francisco, Calif.; Phoenix; Las Vegas; St. Louis; Collinsville, Ill.; Dallas; Houston and Atlanta. McCarthy is 100 percent employee owned.  More information about the company is available online at www.mccarthy.com.

Related Stories

Museums | Jan 18, 2023

Building memory: Why interpretive centers matter in an era of social change

The last few years have borne witness to some of the most rapid cultural shifts in our nation’s long history. If the experience has taught us anything, it is that we must find a way to keep our history in view, while also putting it in perspective.

ProConnect Events | Jan 17, 2023

3 ProConnect Single Family events for Home Builders and Product Manufacturers set for 2023

SGC Horizon, parent company of ProBuilder, will present 3 ProConnect Single Family Events this year. At ProConnect Single Family, Home Builders meet in confidential 20-minute sessions with Building Product Manufacturers to discuss upcoming projects, learn about new products, and discover practical solutions to technical problems.

University Buildings | Jan 17, 2023

Texas Christian University breaks ground on medical school for Dallas-Fort Worth region

Texas Christian University (TCU) has broken ground on the Anne Burnett Marion School of Medicine, which aims to help meet the expanding medical needs of the growing Dallas-Fort Worth region.

Green | Jan 17, 2023

Top 10 U.S. states for green building in 2022

The U.S. Green Building Council (USGBC) released its annual ranking of U.S. states leading the way on green building, with Massachusetts topping the list. The USGBC ranking is based on LEED-certified gross square footage per capita over the past year. 

Libraries | Jan 13, 2023

One of the world’s largest new libraries opens in Shanghai

Designed by Schmidt Hammer Lassen Architects, Shanghai Library East covers more than 1.2 million sf, 80% of it dedicated to community activity.

Religious Facilities | Jan 9, 2023

Santiago Calatrava-designed St. Nicholas Greek Orthodox Church opens in New York

In December, New York saw the reopening of the new St. Nicholas Greek Orthodox Church and National Shrine—the only religious structure destroyed on 9/11. Renowned architect and engineer Santiago Calatrava designed St. Nicholas Church to address the traditional Greek Orthodox liturgy while honoring the Church’s connection with the World Trade Center Memorial site.

Government Buildings | Jan 9, 2023

Blackstone, Starwood among real estate giants urging President Biden to repurpose unused federal office space for housing

The Real Estate Roundtable, a group including major real estate firms such as Brookfield Properties, Blackstone, Empire State Realty Trust, Starwood Capital, as well as multiple major banks and CRE professional organizations, recently sent a letter to President Joe Biden on the implications of remote work within the federal government.

Sustainability | Jan 9, 2023

Innovative solutions emerge to address New York’s new greenhouse gas law

New York City’s Local Law 97, an ambitious climate plan that includes fines for owners of large buildings that don’t significantly reduce carbon emissions, has spawned innovations to address the law’s provisions.

Fire and Life Safety | Jan 9, 2023

Why lithium-ion batteries pose fire safety concerns for buildings

Lithium-ion batteries have become the dominant technology in phones, laptops, scooters, electric bikes, electric vehicles, and large-scale battery energy storage facilities. Here’s what you need to know about the fire safety concerns they pose for building owners and occupants.

Market Data | Jan 6, 2023

Nonresidential construction spending rises in November 2022

Spending on nonresidential construction work in the U.S. was up 0.9% in November versus the previous month, and 11.8% versus the previous year, according to the U.S. Census Bureau.

boombox1
boombox2
native1

More In Category




Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021