Mobile application foursquare has appointed New York City’s premier contracting and construction management firm, Aragon Construction, to complete a 20,000 sf build-out at their new tenth floor office space at 568 Broadway. The project will be completed in early January.
Aragon is constructing the top two floors of space in partnership with Echo Design + Architecture, led by Manhattan-based architect Ajay Chopra. The tenth floor features the first phase of the build-out, which will eventually encompass the eleventh floor for a total of around 56,000 sf.
The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board. The company will also make use of iPads attached to the main reception area for a tech-savvy entranceway that can be programmed for different themes.
With the short time frame of the build-out, foursquare will make use of many existing elements in the space, including many of the existing offices with glass doors and fronts. Two new offices will be added, as well as a high-tech conference room with a ceiling projector and colorful interior walls. BD+C
Related Stories
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.