Apple will delay the construction of a secondary, 300,000-sf research and development building on its "spaceship" campus in an attempt to drive down the cost of developing its new headquarters. In a filing with the City of Cupertino, Apple said construction of the office building on North Tantau Avenue will now commence as part of Phase 2 of its campus development, a delay that will see work begin once its iconic spaceship building has opened in 2016.
Originally scheduled for completion in 2015, Apple has been forced to push back its Campus 2 move-in date until the summer of 2016. When the campus was announced in 2011, the project already had a budget of $3 billion but that number has reportedly risen to over $5 billion as Apple moves ahead with development of what Steve Jobs said would become "the best office building in the world" — thanks to its curved glass exterior and energy-efficient design. Apple says that its development schedule "may be modified to meet [its] business needs" moving forward, so that may not be the last of its revisions. Despite these early setbacks, Apple is focused on opening its circular 2.8 million-sf building within three years, allowing it to hold more than 12,000 employees.
(http://www.theverge.com/2013/4/25/4264622/apple-delays-campus-2-office-construction)
Related Stories
| Oct 4, 2022
Rental property owners want access to utility usage data for whole properties
As pressure from investors for ESG reporting mounts, owners of multifamily properties increasingly look to collect whole-building utility usage data.
| Oct 4, 2022
In dire need of affordable housing, Aspen, Colo. will get a development that provides 277 affordable homes
A few miles from downtown Aspen, Colo., a development will provide 277 new affordable homes for an area experiencing a dire affordable housing crisis.
Green | Oct 3, 2022
California regulators move to ban gas heaters for existing buildings
California regulators voted unanimously recently on a series of measures that include a ban on the sale of natural gas-powered heating and hot water systems beginning in 2030.
| Oct 3, 2022
The College of the Holy Cross completes a $110 million performing arts center
In Worcester, Mass., a one-hour drive from Boston, the College of the Holy Cross has completed its $110 million Prior Performing Arts Center.
Resiliency | Sep 30, 2022
Designing buildings for wildfire defensibility
Wold Architects and Engineers' Senior Planner Ryan Downs, AIA, talks about how to make structures and communities more fire-resistant.
| Sep 30, 2022
Manley Spangler Smith Architects partners with PBK in strategic merger
Manley Spangler Smith Architects (MSSA), a Georgia-based, full-service architectural firm specializing in educational and municipal facilities, announced today a significant development aimed at increasing its capabilities, expertise, and suite of services.
| Sep 30, 2022
Lab-grown bricks offer potential low-carbon building material
A team of students at the University of Waterloo in Canada have developed a process to grow bricks using bacteria.
| Sep 29, 2022
FitzGerald establishes Denver office
The new location bolsters FitzGerald’s nationwide reach and capitalizes on local expertise and boots-on-the-ground to serve new and existing clients seeking to do business in Denver and the Front Range, as well as the Southwest United States, California, and Texas.
| Sep 28, 2022
New digital platform to foster construction supply chains free of forced labor
Design for Freedom by Grace Farms and the U.S. Coalition on Sustainability formed a partnership to advance shared goals regarding sustainable and ethical building material supply chains that are free of forced labor.
| Sep 27, 2022
New Buildings Institute released the Existing Building Decarbonization Code
New Buildings Institute (NBI) has released the Existing Building Decarbonization Code.