flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Apple is building a 192-room hotel on its billion-dollar Austin Campus

Hotel Facilities

Apple is building a 192-room hotel on its billion-dollar Austin Campus

A hotel brand has yet to be announced.


By David Malone, Associate Editor | May 26, 2020
Aerial rendering of Apple's under construction Austin Campus

Rendering courtesy Apple

Announced in a revised site plan approved by the City of Austin on April 29, Apple is adding a 75,500-sf, six-story hotel to its billion-dollar corporate campus that is currently under construction in Northwest Austin. The project comes as a bit of a surprise as the plans for the hotel were not included in the original site plans filed in December 2018, according to Culturemap Austin

The entire Austin campus is slated for completion in 2022 and with an initial employee count of 5,000. Over time, the campus will house 15,000 employees. While nothing has been announced yet regarding the specifics of the 192-room hotel (including the brand),  the facility will most likely be used for visiting employees, customers, and the like, as the 13-acre campus will surely draw many visitors.

The hotel will give Apple more control over all aspects of where visitors to the Austin campus will stay, including amenities and cleanliness (an important factor in a post covid-19 world).

 

Related Stories

| Apr 11, 2014

Start your engines: Ferrari plans to build first ever hotel

Clad in the carmaker's signature "Ferrari red," the hotel will resemble the grill and hood of one of its iconic cars.

| Apr 9, 2014

5 important trends shaping today’s hotel construction market

AEC firms, developers, and investors worldwide are bullish on hotels. Our hospitality Giants share what’s new in this fast-morphing sector.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 8, 2014

Gehry, Foster unveil plans for Battersea Power Station redevelopment [slideshow]

Phase 3 of the massive redevelopment of the London landmark will include more than 1,300 residential units, a 160-room hotel, and 350,000 sf of retail space.

| Apr 8, 2014

First look: Zaha Hadid reveals design for dreamy sculptural hotel

Hadid's design, which will become the fifth hotel tower in the City of Dreams entertainment hub in Macau, features a latticed exoskeleton enveloping the building's exterior.  

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 27, 2014

16 kitchen and bath design trends for 2014

Work on multifamily housing projects? Here are the top kitchen and bath design trends, according to a survey of more than 420 kitchen and bath designers. 

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 25, 2014

World's tallest towers: Adrian Smith, Gordon Gill discuss designing Burj Khalifa, Kingdom Tower

The design duo discusses the founding of Adrian Smith + Gordon Gill Architects and the design of the next world's tallest, Kingdom Tower, which will top the Burj Khalifa by as much as a kilometer.

| Mar 24, 2014

Snøhetta unveils plans for serpentine mountain hotel

The winding hotel and apartment building will be built between the mountains and the sea in remote Glåpen, Norway.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021