flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Appellate court enacts nationwide stay on controversial expansion of Clean Water Act

Codes and Standards

Appellate court enacts nationwide stay on controversial expansion of Clean Water Act

New EPA rule suspended until court cases settled.


By Peter Fabris, Contributing Editor | October 16, 2015

The EPA had expanded the definition of “waters of the United States” under the act to include smaller streams and other bodies of water. Photo: GinaD/Wikimedia Commons.

The U.S. Court of Appeals for the Sixth Circuit enacted a nationwide stay on the Environmental Protection Agency’s expanded Clean Water Act provisions.

The EPA had expanded the definition of “waters of the United States” under the act to include smaller streams and other bodies of water. The Sixth Circuit Court said in its ruling: “A stay temporarily silences the whirlwind of confusion that springs from uncertainty about the requirements of the new rule and whether they will survive legal testing.”

The EPA and the Army Corps of Engineers will use their previous definitions of “waters of the U.S.” until federal courts sort out the validity of the expanded definition.

“We applaud the court for taking this action to suspend EPA’s water rule,” said National Association of Home Builders Chairman Tom Woods. “NAHB has been working diligently on the legislative and legal fronts to overturn this rule that raises housing costs, tramples states’ rights, and adds unnecessary regulatory burdens to small businesses.”

Related Stories

Codes and Standards | Apr 29, 2020

New York City tightens restrictions on construction during pandemic

Dept. of Buildings has issued more than 100 violations and stop-work orders.

Codes and Standards | Apr 28, 2020

ASHRAE, WELL panels to tackle revising standards to limit spread of viruses in buildings

Will examine ways to reduce infectious threats through building designs and operations.

Codes and Standards | Apr 24, 2020

Dept. of Labor issues guidance for respiratory protection during N95 shortage

Elastomeric respirators or powered, air-purifying respirators, and expired N95s are allowable alternatives

Codes and Standards | Apr 23, 2020

Group will create ecosystem for smart building data

Seven Finnish companies aim to integrate all technical systems into a single platform.

Codes and Standards | Apr 23, 2020

COVID-19 epidemic demonstrates value of flexible hospital space

Some rooms being repurposed for ICU care.

Codes and Standards | Apr 15, 2020

Embodied carbon footprint can be reduced by using conventional materials

High-SCM concrete, and cellulose and wood fiber insulation among the greener alternatives.

Coronavirus | Apr 13, 2020

COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open

Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online. 

Codes and Standards | Apr 13, 2020

Design competition focuses on reducing urban heat island effect

Cool Abu Dhabi aims to transform urban life in the Middle East.

Codes and Standards | Apr 13, 2020

What building science says about reducing COVID-19 transmission

Impact of temperature and relative humidity is unclear.

Codes and Standards | Apr 9, 2020

Owners retrofitting properties, monitoring performance during epidemic

Covid-19 outbreak may lead employers to reevaluate office commitments.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021