Palo Verde Apartments, in Sun Valley, Calif., opened to residents in early 2012 on the site of a former self-serve car wash facility.
Developed by L.A. Family Housing of North Hollywood with a design by Gonzalez Goodale Architects, the new infill project provides safe and affordable housing for previously homeless single adults living with mental illness.
The 60-unit complex embodies the concept of permanent supportive housing, an approach that provides the requisite atmosphere of stability with the goal of fostering socialization among the residents and openness to support and treatment. The development includes offices, community and program space where residents can access social and recreational, counseling, recovery and employment services.
The 35,000-sf U-shaped complex takes its architectural cues from the surrounding Mediterranean-style neighborhood, reinvigorating it with a contemporary character. The front elevation features projecting bay windows and balconies that animate the façade and offer generous views of the neighborhood, creating an inviting atmosphere.
Another key component of the project design and construction was environmental sustainability. Palo Verde surpasses the State of California standards for energy efficiency by 37% and is aiming for a LEED for Homes Gold rating. Green features include solar panels that generate approximately 41% of the building's electrical needs, Energy Star appliances, high-efficiency mechanical equipment, water-saving plumbing fixtures and drought-tolerant landscaping. BD+C
Related Stories
Office Buildings | Oct 12, 2011
8 Must-know Trends in Office Fitouts
Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.
| Oct 12, 2011
FMI’s Construction Outlook: Third Quarter 2011 Report
Construction Market Forecast: The general economy is seeing mixed signs.
| Oct 12, 2011
Bulley & Andrews celebrates 120 years of construction
The family-owned and operated general contractor attributes this significant milestone to the strong foundation built decades ago on honesty, integrity, and service in construction.
| Oct 12, 2011
Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health
Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will
| Oct 11, 2011
AIA introduces five new documents for use on sustainable projects
These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand.
| Oct 11, 2011
Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center
For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment.
| Oct 11, 2011
ThyssenKrupp elevator cabs validated by UL Environment
The conclusive and independent third-party validation process is another step toward a green product line.
| Oct 11, 2011
Ballard Spahr launches real estate recovery group
The new group represents an expansion of the company’s Distressed Real Estate Initiative, which was launched in 2008 to help clients throughout the country plan, adapt and prosper in a challenging economic environment.
| Oct 11, 2011
Onex completes investment in JELD-WEN
With the completion of the JELD-WEN investment, Onex Partners III is approximately 40% invested.
| Oct 7, 2011
GREENBUILD 2011: Demand response partnership program announced at Greenbuild 2011
Program will use USGBC’s newly revised LEED Demand Response credit as an implementation guideline and leverage its relationships with the building community to foster adoption and participation in existing utility and solution provider demand response offerings.