Palo Verde Apartments, in Sun Valley, Calif., opened to residents in early 2012 on the site of a former self-serve car wash facility.
Developed by L.A. Family Housing of North Hollywood with a design by Gonzalez Goodale Architects, the new infill project provides safe and affordable housing for previously homeless single adults living with mental illness.
The 60-unit complex embodies the concept of permanent supportive housing, an approach that provides the requisite atmosphere of stability with the goal of fostering socialization among the residents and openness to support and treatment. The development includes offices, community and program space where residents can access social and recreational, counseling, recovery and employment services.
The 35,000-sf U-shaped complex takes its architectural cues from the surrounding Mediterranean-style neighborhood, reinvigorating it with a contemporary character. The front elevation features projecting bay windows and balconies that animate the façade and offer generous views of the neighborhood, creating an inviting atmosphere.
Another key component of the project design and construction was environmental sustainability. Palo Verde surpasses the State of California standards for energy efficiency by 37% and is aiming for a LEED for Homes Gold rating. Green features include solar panels that generate approximately 41% of the building's electrical needs, Energy Star appliances, high-efficiency mechanical equipment, water-saving plumbing fixtures and drought-tolerant landscaping. BD+C
Related Stories
| Nov 16, 2011
John Patelski joins Ghafari as executive vice president
As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.
| Nov 15, 2011
Struggling economy demands construction industry embrace enterprise-wide risk management
In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 15, 2011
Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa
Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.
| Nov 14, 2011
Summit Design+Build selected at GC for new Office Concepts headquarters
The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout.
| Nov 14, 2011
Griffin Electric completes electrical work at Cary Arts Center
The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.
| Nov 14, 2011
VanSumeren appointed to Traco general manager
VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco.