flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Apartment takes progressive turn in architecturally traditional D.C.

Sponsored Content Multifamily Housing

Apartment takes progressive turn in architecturally traditional D.C.

ALPOLIC's finish is notable in a huge “fin” that gives the Lyric 440K building its focal point


By ALPOLIC | October 15, 2015
Apartment takes progressive turn in architecturally traditional D.C.

Lyric 440, Washington D.C., Alpolic/fr in MFS Mica Silver, SBP Dragonfly Prismatic, BNT Bone White Solid Finishes

When you think about styles of architecture in Washington, D.C., the first word that comes to mind probably isn’t “progressive.” Encyclopedia Britannia puts it this way:

“Three factors have radically influenced the style of Washington’s architecture: restrictions on the height of structures, Classicism, and conservatism.”

The new Lyric 440K Apartments are a prime example – an innovative 14-story structure housing 234 one- and two-bedroom units in the heart of the up-and-coming Mount Vernon Triangle.

Troy Balkema, the project director at Quadrangle Development Corporation who oversaw the Lyric 440K’s design and construction, explains that “this neighborhood is due east of the Washington Convention Center, and it’s been transitioning for probably 10 or 12 years now.”

Jasna Bijelic, senior designer at Davis Carter Scott (DCS) Design, was the project’s architect. She recalls, “The porcelain tile skin was very expensive, but we wanted to achieve it, so we were looking for something that would complement what we were doing. That’s how ALPOLIC® materials came into play. They are a very high quality aluminum composite cladding material at a very affordable price. Partially, I think that made it possible to execute the design we have today.” Discovering high-quality ALPOLIC® composites in an exceptional array of finishes opened her eyes to new possibilities. “I really give compliments to ALPOLIC®/fr Materials,” she says. “They have a nice website where you can find lots of interesting finishes.” Instead of the usual shades of gray, whites and muted solid colors, with ALPOLIC® Materials “you have all these different finishes that are kind of inspiring.”

Lyric 440, Washington D.C., Alpolic/fr in MFS Mica Silver, SBP Dragonfly Prismatic, BNT Bone White Solid Finishes

That inspiration finds its most notable expression in a huge “fin” that gives the Lyric 440K building its focal point. The most striking thing about the “fin” is its color. Bijelic explains, “When I was ordering samples, I was going through the website, and I found this finish called Dragonfly, and I couldn’t resist. “The Dragonfly did such a good job of creating a level of interest and being so unique in the neighborhood and in DC in general, that everybody who sees it is stunned initially with what they see – how it changes from teal, to purple, to almost orange or pink depending on how the sun hits it.”

In addition to the “fin” in our custom SBP Dragonfly Prismatic finish, the building incorporates ALPOLIC® materials in BNT Bone White and MFS Mica Silver.

All these finishes are made possible by the unrivaled color, brightness and gloss range available with Lumiflon® FEVE fluoropolymer resin and Valflon® coatings supplied to us exclusively by Valspar®.

Murray Walker, senior project director at DCS, explains that there were many places where the glazing, tiling and composite material elements all converged in the same place. “It was a complicated building to detail and get it right,” Walker says. “We used an open joint system to complement the tile rainscreen, and it also had to tie in with our window systems. We were very pleased with the ALPOLIC® product. We like working with it. We can detail it really well – particularly for the waterproofing of the building and good thermal control.” And, he says, echoing Joe Paradise, “It all comes together really well.”

The Lyric 440K is one building that honors tradition while looking proudly forward to a new way.

Related Stories

| May 11, 2014

Final call for entries: 2014 Giants 300 survey

BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.

| May 5, 2014

Toronto residential tower to feature drawer-like facade scheme

Some of the apartments in the new River City development will protrude from the building at different lengths, creating a drawer-like "push-pull" effect.

| May 2, 2014

Norwegian modular project set to be world's tallest timber-frame apartment building [slideshow]

A 14-story luxury apartment block in central Bergen, Norway, will be the world's tallest timber-framed multifamily project, at 49 meters (160 feet). 

| May 1, 2014

Tight on space for multifamily? Check out this modular kitchen tower

The Clei Ecooking kitchen, recently rolled out at Milan's Salone de Mobile furniture fair, squeezes multiple appliances into a tiny footprint.

| Apr 30, 2014

Visiting Beijing's massive Chaoyang Park Plaza will be like 'moving through a urban forest'

Construction work has begun on the 120,000-sm mixed-use development, which was envisioned by MAD architects as a modern, urban forest.

| Apr 29, 2014

Best of Canada: 12 projects nab nation's top architectural prize [slideshow]

The conversion of a Mies van der Rohe-designed gas station and North Vancouver City Hall are among the recently completed projects to win the 2014 Governor General's Medal in Architecture. 

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

| Apr 23, 2014

Developers change gears at Atlantic Yards after high-rise modular proves difficult

At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.

| Apr 17, 2014

Online mapping tool helps teams determine multifamily project tax credit eligibility

Accounting and advisory firm Baker Tilly has launched a new, interactive online mapping tool that helps users determine if a business or development project may qualify for the New Markets Tax Credit or Low-Income Housing Tax Credit program.

| Apr 11, 2014

ULI report documents business case for building healthy projects

Sustainable and wellness-related design strategies embody a strong return on investment, according to a report by the Urban Land Institute.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021