flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Apartment takes progressive turn in architecturally traditional D.C.

Sponsored Content Multifamily Housing

Apartment takes progressive turn in architecturally traditional D.C.

ALPOLIC's finish is notable in a huge “fin” that gives the Lyric 440K building its focal point


By ALPOLIC | October 15, 2015
Apartment takes progressive turn in architecturally traditional D.C.

Lyric 440, Washington D.C., Alpolic/fr in MFS Mica Silver, SBP Dragonfly Prismatic, BNT Bone White Solid Finishes

When you think about styles of architecture in Washington, D.C., the first word that comes to mind probably isn’t “progressive.” Encyclopedia Britannia puts it this way:

“Three factors have radically influenced the style of Washington’s architecture: restrictions on the height of structures, Classicism, and conservatism.”

The new Lyric 440K Apartments are a prime example – an innovative 14-story structure housing 234 one- and two-bedroom units in the heart of the up-and-coming Mount Vernon Triangle.

Troy Balkema, the project director at Quadrangle Development Corporation who oversaw the Lyric 440K’s design and construction, explains that “this neighborhood is due east of the Washington Convention Center, and it’s been transitioning for probably 10 or 12 years now.”

Jasna Bijelic, senior designer at Davis Carter Scott (DCS) Design, was the project’s architect. She recalls, “The porcelain tile skin was very expensive, but we wanted to achieve it, so we were looking for something that would complement what we were doing. That’s how ALPOLIC® materials came into play. They are a very high quality aluminum composite cladding material at a very affordable price. Partially, I think that made it possible to execute the design we have today.” Discovering high-quality ALPOLIC® composites in an exceptional array of finishes opened her eyes to new possibilities. “I really give compliments to ALPOLIC®/fr Materials,” she says. “They have a nice website where you can find lots of interesting finishes.” Instead of the usual shades of gray, whites and muted solid colors, with ALPOLIC® Materials “you have all these different finishes that are kind of inspiring.”

Lyric 440, Washington D.C., Alpolic/fr in MFS Mica Silver, SBP Dragonfly Prismatic, BNT Bone White Solid Finishes

That inspiration finds its most notable expression in a huge “fin” that gives the Lyric 440K building its focal point. The most striking thing about the “fin” is its color. Bijelic explains, “When I was ordering samples, I was going through the website, and I found this finish called Dragonfly, and I couldn’t resist. “The Dragonfly did such a good job of creating a level of interest and being so unique in the neighborhood and in DC in general, that everybody who sees it is stunned initially with what they see – how it changes from teal, to purple, to almost orange or pink depending on how the sun hits it.”

In addition to the “fin” in our custom SBP Dragonfly Prismatic finish, the building incorporates ALPOLIC® materials in BNT Bone White and MFS Mica Silver.

All these finishes are made possible by the unrivaled color, brightness and gloss range available with Lumiflon® FEVE fluoropolymer resin and Valflon® coatings supplied to us exclusively by Valspar®.

Murray Walker, senior project director at DCS, explains that there were many places where the glazing, tiling and composite material elements all converged in the same place. “It was a complicated building to detail and get it right,” Walker says. “We used an open joint system to complement the tile rainscreen, and it also had to tie in with our window systems. We were very pleased with the ALPOLIC® product. We like working with it. We can detail it really well – particularly for the waterproofing of the building and good thermal control.” And, he says, echoing Joe Paradise, “It all comes together really well.”

The Lyric 440K is one building that honors tradition while looking proudly forward to a new way.

Related Stories

Multifamily Housing | Feb 19, 2015

Is multifamily construction getting too frothy for demand?

Contractors are pushing full speed ahead, but CoStar Group thinks a slowdown might be in order this year.

Multifamily Housing | Feb 18, 2015

Make It Right unveils six designs for affordable housing complex

BNIM is among the six firms involved in the project.

Office Buildings | Feb 18, 2015

Commercial real estate developers optimistic, but concerned about taxes, jobs outlook

The outlook for the commercial real estate industry remains strong despite growing concerns over sluggish job creation and higher taxes, according to a new survey of commercial real estate professionals by NAIOP.

Multifamily Housing | Feb 17, 2015

NYC multifamily sales increased by 39% in 2014

For New York City as a whole, $20 million-plus deals accounted for more than half of all transactions.

Multifamily Housing | Feb 17, 2015

California launches pilot program to finance multifamily retrofits for energy efficiency

The Obama Administration and the state of California are teaming with the Chicago-based MacArthur Foundation on a pilot program whose goal is to unlock Property-Assessed Clean Energy financing for multifamily housing.

Multifamily Housing | Feb 17, 2015

Young Millennials likely to return home

Ninety percent of individuals born between 1980 and 1984 and who hold a Bachelor’s degree left home before they were 27 years hold. However, half of this group later returned to their parents’ home, according to a study by the National Longitudinal Study of Youth.

High-rise Construction | Feb 17, 2015

Work begins on Bjarke Ingels' pixelated tower in Calgary

Construction on Calgary’s newest skyscraper, the 66-story Telus Sky Tower, recently broke ground. 

Mixed-Use | Feb 13, 2015

First Look: Sacramento Planning Commission approves mixed-use tower by the new Kings arena

The project, named Downtown Plaza Tower, will have 16 stories and will include a public lobby, retail and office space, 250 hotel rooms, and residences at the top of the tower. 

Codes and Standards | Feb 12, 2015

New Appraisal Institute form aids in analysis of green commercial building features

The Institute’s Commercial Green and Energy Efficient Addendum offers a communication tool that lenders can use as part of the scope of work. 

Multifamily Housing | Feb 9, 2015

GSEs and their lenders were active on the multifamily front in 2014

Fannie Mae and Freddie Mac securitized more than $57 billion for 850,000-plus units.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021