flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

American Iron and Steel Institute publishes design guide for new profiled steel diaphragm panels standard

American Iron and Steel Institute publishes design guide for new profiled steel diaphragm panels standard

Five design examples offered


December 23, 2014

The American Iron and Steel Institute (AISI) published AISI D310-14, “Design Examples for the Design of Profiled Steel Diaphragm Panels Based on AISI S310-13.”

This design guide is the supporting document for AISI S310, North American Standard for the Design of Profiled Steel Diaphragm Panels. Both documents are available at www.aisistandards.org.

AISI D310-14 provides five design examples that illustrate the application of design provisions in AISI S310. The standard offers design provisions for diaphragms consisting of profiled steel decks or panels, including acoustic panels, cellular deck, and composite deck filled with concrete.

The illustrative examples determine the strengths and stiffness of diaphragms formed with wide rib decks, profiled panels, and panels with insulation, and with various support materials and loading conditions.

(http://www.smdisteel.org/Global/Document%20Types/News/2014/Construction%20-%20AISI%20Publishes%20Design%20Guide%20for%20New%20Standard%20on%20Profiled%20Steel%20Diaphragm%20Panels.aspx?siteLocation=d85831cd-1032-4b01-9c25-bc65183aaad1)

Related Stories

| Aug 30, 2012

Public comment period is open for CRRC-1 standard

The CRRC-1 standard covers specimen preparation and test methods for measuring the initial and aged solar reflectance and thermal emittance of roofing products.

| Aug 30, 2012

LEED system's footprint reaches 2 billion sf, with 7 billion sf in the pipeline

About 7 billion more sf of commercial space is expected in the pipeline.

| Aug 30, 2012

Georgia drops LEED wood source standard on state projects

Currently, LEED green building standards only accept timber products certified by the Forest Stewardship Council (FSC).

| Aug 21, 2012

AGC offers second edition of the Federal Government Contractor: Ethics & Compliance Programs manual

This publication helps contractors appreciate the grounds for an alleged violation of the expected standards of business conduct and ethics, and to develop, implement, and document an effective ethics and compliance program.

| Aug 21, 2012

Federal Safe Building Code Incentive Act’s bipartisan support, no notable objection, bodes well for passage

The Safe Building Code Incentive Act would give states a little extra post-disaster federal funding if they enacted and enforced nationally recognized building codes for businesses and residences before disaster strikes.

| Aug 16, 2012

New York’s Barclays Center project accused of ignoring noise, pollution regulations

Construction crews racing to finish the Brooklyn Barclays Center are ignoring strict regulations to reduce noise and pollution, a new report by critics has found.

| Aug 16, 2012

Harness saves life of worker cleaning Washington state Capitol

Fall-protection equipment helped save the life of a worker who was cleaning the Washington state Capitol building in Olympia, after the platform he was using gave way.

| Aug 16, 2012

CSI webinar on August 21 focuses on electronic energy control

The Construction Specifications Institute (CSI) is sponsoring a free webinar on August 21 at 2:00 p.m. (EDT) on electronic energy control.

| Aug 16, 2012

Public sector pushes sustainable building forward

Not usually noted for its innovation, the public sector has done the most to advance sustainable building, according to a recent panel of green building professionals.

| Aug 16, 2012

Canada’s first net-positive building under construction in Milton, Ontario

The GreenLife Business Centre in Milton, Ontario near Toronto is set to become the first net-positive energy building in Canada.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021